Implementation<br />

See the implementation chart<br />

on pages 125-6 for the<br />

priority and the assignment <strong>of</strong><br />

responsibility<br />

for<br />

implementation <strong>of</strong> these<br />

transportation strategies.<br />

Conceptual Ring Road<br />

The route for the conceptual<br />

ring road shown on the map<br />

on the facing page is<br />

illustrative only and is<br />

subject to change.<br />

The intent <strong>of</strong> the map is to<br />

show general routes rather<br />

than specific locations.<br />

TRANSPORTATION STRATEGIES<br />

Improve Roadway Circulation<br />

1. Implement circulation alternatives that will help serve the <strong>Town</strong> Center area and relieve some <strong>of</strong> the traffic issues on<br />

major roads, such as possible “ring roads” around the Center.<br />

2. Update road standards in local regulations to provide for vehicular circulation while preserving community character.<br />

3. Continue to reduce curb cuts, interconnect parking areas, and implement other access management strategies along<br />

arterial roads.<br />

4. Require road connections in new developments to provide for overall traffic circulation in the community, while<br />

recognizing that cul-de-sac streets are desired by developers and homeowners.<br />

5. Evaluate unpaved roads for improvement, abandonment, or discontinuance.<br />

6. Consider allowing landscaped center islands in permanent cul-de-sacs with appropriate design standards.<br />

7. Encourage creation and enhancement <strong>of</strong> scenic roads.<br />

8. Consider reclassifying roads, when appropriate.<br />

9. Continue to maintain and upgrade local roads.<br />

10. Implement the recommendations from the study <strong>of</strong> the <strong>Town</strong> Center and continue to make improvements in the <strong>Town</strong><br />

Center such as driveway and parking interconnections.<br />

11. Pursue interchange improvements at exit 17 <strong>of</strong> Route 2.<br />

12. Request that ConnDOT review traffic signal sequencing annually to avoid creating undue traffic congestion.<br />

Arterial Road Sidewalk<br />

102