5.4) Phasing and Implementation<br />
Based on <strong>the</strong> assessments carried out an indicative implementation timeframe is highlighted at Figure<br />
5.2. This demonstrates which policies should be prioritised and which can be implemented at a later<br />
date. Interdependencies are highlighted.<br />
Figure 5.2: <strong>Taxi</strong> <strong>Transformation</strong> Measures<br />
Task<br />
Data Collection Baseline data analysed<br />
Observations, Public Attitude and Household Surveys<br />
Investigation of complaints and fur<strong>the</strong>r data provided by operators<br />
Analysis of Results<br />
Regulatory Impact Assessment<br />
Regulatory Impact Assessment<br />
2011 2012 2013 2014<br />
2015 2016<br />
2021<br />
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4<br />
Confirm policies<br />
Regulatory Change and introduction of quality regulations Introduce revised regulations Introduce 1Malaysia<br />
Transfer to operator based licensing<br />
Develop and testing driver, vehicle and operator database<br />
Database go live operation phase<br />
Develop and introduce penalty points framework<br />
Enhance driver charter<br />
Develop and Introduce checking at annual driver card renewal<br />
Review duration of vehicle licenes issued to 3 years<br />
Initial fare review<br />
Regular fare update<br />
1Malaysia accreditation brand<br />
Driver Policy<br />
Implement training/medical requirement<br />
Develop driver training scheme<br />
Introduce training and testing requirement for new drivers<br />
Training and testing of existing drivers<br />
Driver medical requirement development<br />
Vehicle Specification Policy Implement policy Decision point for continuation of budget and executive class<br />
Develop and introduce new vehicle class<br />
Revise vehicle age limit policy<br />
Revise vehicle specifications<br />
Develop and introduce annual vehicle testing framework<br />
Investigate and incentivise radio circuits<br />
Revise branding and livery policy<br />
Enforcement Policy<br />
Enforce existing regulations<br />
Enforce new regulations<br />
Review and monitor data from database<br />
Industry performance monitoring and target setting<br />
External Network Policy Change<br />
Regular industry data collection<br />
Public Education and Marketing<br />
Central customer service centre<br />
Bus lane usage<br />
Stakeholder working<br />
<strong>Taxi</strong> stand review and policy development<br />
Implement policy<br />
Start<br />
Key Development and Implement Test Phase Policy Introduction or decision point<br />
Summary timeline<br />
Dependancy<br />
This delivery plan will be supported by o<strong>the</strong>r elements of <strong>the</strong> LPTMP which are reported in <strong>the</strong><br />
remaining Subsidiary <strong>Plan</strong>s. These include:<br />
<br />
<br />
<br />
<br />
<br />
Urban Rail Development <strong>Plan</strong> (URDP)<br />
Bus <strong>Transformation</strong> <strong>Plan</strong> (BTP)<br />
Interchange and Integration <strong>Plan</strong> (IIP)<br />
Land Use <strong>Plan</strong> (LUP)<br />
Travel Demand Management <strong>Plan</strong> (TDMP)<br />
Toge<strong>the</strong>r <strong>the</strong>se provide an integrated LPT plan for <strong>the</strong> GKL/KV region and are summarised in <strong>the</strong><br />
overall LPTMP document. The plan will also identify <strong>the</strong> role of each of <strong>the</strong>se measures in terms of<br />
proposed modal share targets which will be contained within <strong>the</strong> LPTMP.<br />