completed in October 2006. The RC drilling at Santa Rita was not included in the resource estimates as it was<br />

completed after the commencement of the resource evaluation studies.<br />

Summary Drilling Statistics Grouped by Drill Method<br />

No DDH No RC No Auger All Total<br />

Deposit DDH (m) RC (m) Auger (m) Holes M<br />

Santa Rita 302 70,276.46 2 368.00 0 — 304 70,644.46<br />

Diamond Core Drilling<br />

The diamond drilling was predominantly carried out by Boart Longyear Geoserv. The rigs used were<br />

sled-mounted LM-38’s and LM-44’s. The number of rigs on site at any one time varied between one and four.<br />

One sled-mounted diamond drill-rig from GEOSOL (Geologia e Sondagens Ltda.) was also used on site from<br />

April 4, 2006 until the end of this phase of drilling. Between September 17, 2004 and August 9, 2006,<br />

192 diamond drillholes of early exploration/resource drilling were completed for a total of 41,911 metres. All<br />

holes were drilled with HQ pre-collars and completed with NQ core. Drilling was completed in runs of<br />

three metres.<br />

All holes have been down-hole surveyed by either single-shot surveys or post-drilling via a north-seeking<br />

gyroscope, or, by both of these methods. The single shot surveying was completed by Boart Longyear Geoserv<br />

and the gyroscope surveying was completed by Downhole Surveys DHS Pty Ltd. from October to<br />

December 2005.<br />

Originally the single-shot surveys were taken at an initial down-hole depth of 10 metres, then at a 50 metre<br />

depth, and subsequently at 50 metres down-hole intervals. This has since been modified to one survey at<br />

10 metres, and then a survey every 30 metres down the hole until the end. The gyroscope surveying has generally<br />

been completed inside the PVC casing post drilling, although a limited number of holes were surveyed inside the<br />

drill rods. The gyroscope survey interval was three metres with surveys collected from the beginning of the hole<br />

until just above the end of the hole or to the end of the PVC casing. Based on a review of the survey information<br />

RSG Global considers all the data to be well established in 3D space.<br />

Geotechnical logging has routinely been completed at Santa Rita under the supervision of geotechnical<br />

consultants Dempers and Seymour Pty Ltd. A review of the sample recovery was completed by RSG Global<br />

during the February 2006 site visit and excellent recovery was noted.<br />

RC Drilling<br />

A program of RC drilling has recently been commenced at Santa Rita however, little data currently exists.<br />

RSG Global has not assessed this data collection. As such, this data has not been used in the formation of the<br />

Mineral Resource estimate in the Technical Report.<br />

Geosedna Perfurações Especiais S.A. has been contracted to complete the drilling with a W750 truck<br />

mounted rig with air capability of 900cfm/350psi used. All drilling completed to date has been completed with a<br />

5 1 ⁄2 inch face hammer.<br />

RSG Global concluded the RC drilling performance was satisfactory with acceptable daily productivity<br />

rates, sampling recovery and safety standards being achieved.<br />

31