<strong>PROSPECTUS</strong> SUMMARY<br />

The following is a summary of the principal features of the Offering and should be read together with the more detailed<br />

information, financial data and financial statements contained elsewhere in this prospectus. For an explanation of certain<br />

technical terms used in this prospectus, please see ‘‘Glossary of Technical Terms’’ beginning on page A-1 of<br />

this prospectus.<br />

Issuer: <strong>Mirabela</strong> <strong>Nickel</strong> Limited (ACN 108 161 593)<br />

Business of <strong>Mirabela</strong>:<br />

Objective of <strong>Mirabela</strong>:<br />

Santa Rita Project:<br />

<strong>Mirabela</strong> is a mineral exploration company incorporated under the laws of<br />

Australia and listed on the TSX and the ASX. <strong>Mirabela</strong> has a portfolio of<br />

prospective nickel and other base metal projects in Brazil. <strong>Mirabela</strong>’s principal<br />

asset is the Santa Rita disseminated nickel sulphide deposit in the Bahia State,<br />

Brazil. Management believes that the Santa Rita deposit is the largest<br />

disseminated sulphide nickel deposit in South America and the largest greenfield<br />

nickel sulphide discovery in the world in the last ten years.<br />

<strong>Mirabela</strong>’s primary focus is on completing a bankable feasibility study<br />

(the ‘‘BFS’’) for the development of an open pit mine at the Santa Rita deposit<br />

with a four million tonne per annum throughput nickel sulphide flotation<br />

processing plant that will use a conventional flotation processing system to<br />

produce an average of approximately 16,000 tonnes per annum of nickel in<br />

custom concentrate over an expected mine life in excess of ten years (the ‘‘Santa<br />

Rita Project’’).<br />

<strong>Mirabela</strong>’s principal objectives are:<br />

• to complete the BFS in May 2007;<br />

• subject to a positive outcome of the BFS, to commence construction of the<br />

processing facility and associated infrastructure of the Santa Rita Project by<br />

late 2007 in order to commence production in early 2009; and<br />

• to continue its active drilling and exploration program at the Santa Rita<br />

deposit and in the immediately surrounding area, to provide additional<br />

resources to the proposed processing facility.<br />

The highlights of the Santa Rita Project include the following:<br />

• the project site is approximately 140 kilometres by road from the Atlantic<br />

seaport of Ilheus, is within four kilometres of a state highway and an airport<br />

and is well served with infrastructure, including a government power grid<br />

(230kV) and access to water from the nearby Rio de Contas river system;<br />

• the resource estimates for the Santa Rita deposit (using a Ni cut-off grade of<br />

0.35% gabbro and pyroxenite, 0.4% peridotite and 0.5% dunite) are as follows:<br />

Classification Mt Ni (%) Cu (%) Co (%)<br />

Indicated .............................. 52.4 0.62 0.15 0.016<br />

Inferred ............................... 18.0 0.57 0.14 0.015<br />

• the estimate of mineral resources is based on a large technical database<br />

(including the results of 200 diamond drill holes totalling 43,105 metres);<br />

• the Company has a well advanced and active drilling program (370 diamond<br />

drill holes totaling 80,500 metres have been drilled to date) that management<br />

believes will result in an upgrade to the resource estimate;<br />