<strong>PROSPECTUS</strong> SUMMARY<br />
The following is a summary of the principal features of the Offering and should be read together with the more detailed<br />
information, financial data and financial statements contained elsewhere in this prospectus. For an explanation of certain<br />
technical terms used in this prospectus, please see ‘‘Glossary of Technical Terms’’ beginning on page A-1 of<br />
this prospectus.<br />
Issuer: <strong>Mirabela</strong> <strong>Nickel</strong> Limited (ACN 108 161 593)<br />
Business of <strong>Mirabela</strong>:<br />
Objective of <strong>Mirabela</strong>:<br />
Santa Rita Project:<br />
<strong>Mirabela</strong> is a mineral exploration company incorporated under the laws of<br />
Australia and listed on the TSX and the ASX. <strong>Mirabela</strong> has a portfolio of<br />
prospective nickel and other base metal projects in Brazil. <strong>Mirabela</strong>’s principal<br />
asset is the Santa Rita disseminated nickel sulphide deposit in the Bahia State,<br />
Brazil. Management believes that the Santa Rita deposit is the largest<br />
disseminated sulphide nickel deposit in South America and the largest greenfield<br />
nickel sulphide discovery in the world in the last ten years.<br />
<strong>Mirabela</strong>’s primary focus is on completing a bankable feasibility study<br />
(the ‘‘BFS’’) for the development of an open pit mine at the Santa Rita deposit<br />
with a four million tonne per annum throughput nickel sulphide flotation<br />
processing plant that will use a conventional flotation processing system to<br />
produce an average of approximately 16,000 tonnes per annum of nickel in<br />
custom concentrate over an expected mine life in excess of ten years (the ‘‘Santa<br />
Rita Project’’).<br />
<strong>Mirabela</strong>’s principal objectives are:<br />
• to complete the BFS in May 2007;<br />
• subject to a positive outcome of the BFS, to commence construction of the<br />
processing facility and associated infrastructure of the Santa Rita Project by<br />
late 2007 in order to commence production in early 2009; and<br />
• to continue its active drilling and exploration program at the Santa Rita<br />
deposit and in the immediately surrounding area, to provide additional<br />
resources to the proposed processing facility.<br />
The highlights of the Santa Rita Project include the following:<br />
• the project site is approximately 140 kilometres by road from the Atlantic<br />
seaport of Ilheus, is within four kilometres of a state highway and an airport<br />
and is well served with infrastructure, including a government power grid<br />
(230kV) and access to water from the nearby Rio de Contas river system;<br />
• the resource estimates for the Santa Rita deposit (using a Ni cut-off grade of<br />
0.35% gabbro and pyroxenite, 0.4% peridotite and 0.5% dunite) are as follows:<br />
Classification Mt Ni (%) Cu (%) Co (%)<br />
Indicated .............................. 52.4 0.62 0.15 0.016<br />
Inferred ............................... 18.0 0.57 0.14 0.015<br />
• the estimate of mineral resources is based on a large technical database<br />
(including the results of 200 diamond drill holes totalling 43,105 metres);<br />
• the Company has a well advanced and active drilling program (370 diamond<br />
drill holes totaling 80,500 metres have been drilled to date) that management<br />
believes will result in an upgrade to the resource estimate;<br />
1