19.11.2012 Views

Manual on elective ii - theme parks and attractions

Manual on elective ii - theme parks and attractions

Manual on elective ii - theme parks and attractions

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Theme Parks <strong>and</strong> Attracti<strong>on</strong>s<br />

3.2 Operati<strong>on</strong>s management II – Required skills<br />

<strong>and</strong> problem solving<br />

Skills involved<br />

To manage daily operati<strong>on</strong>s successfully, an operati<strong>on</strong>s manager should possess the<br />

following skills:<br />

♦ Comprehensive knowledge across different functi<strong>on</strong>al areas of the site<br />

♦ Thorough underst<strong>and</strong>ing of visitor needs <strong>and</strong> behaviour<br />

♦ The ability to manage the site as a whole while paying attenti<strong>on</strong> to detail<br />

♦ The ability to plan systems <strong>and</strong> procedures in advance, but being flexible in<br />

resp<strong>on</strong>se to changing circumstances<br />

♦ Good communicati<strong>on</strong> skills<br />

♦ The ability to work under pressure <strong>and</strong> in resp<strong>on</strong>se to crises<br />

♦ A good underst<strong>and</strong>ing of the principles of management c<strong>on</strong>trol <strong>and</strong> financial<br />

management<br />

♦ Seeing things from the visitors’ point of view <strong>and</strong> underst<strong>and</strong> staff c<strong>on</strong>cerns<br />

Problems <strong>and</strong> problem solving<br />

There are many unforeseen problems in the day-to-day operati<strong>on</strong>s that need special<br />

attenti<strong>on</strong> from the managers. Some of them happen unexpectedly, such as:<br />

♦ Minor v<strong>and</strong>alism<br />

♦ Mechanical breakdowns of rides or computer systems<br />

♦ Bad weather affecting parts of the operati<strong>on</strong>s<br />

♦ Inadequate staff<br />

Other problems may be l<strong>on</strong>g-st<strong>and</strong>ing <strong>and</strong> c<strong>on</strong>tinuous, like:<br />

♦ L<strong>on</strong>g queues or bottlenecks <strong>on</strong> the site<br />

♦ Slow throughput in catering outlets because of poor design of the facilities<br />

♦ Waste reducti<strong>on</strong>, such as energy usage or unsold food in the catering outlets<br />

64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!