- Page 1 and 2:
ISBN 82-471-8121-5 (printed ver.)IS
- Page 3:
Preface and AcknowledgementsThe wor
- Page 7 and 8:
Table of ContentsPreface and Acknow
- Page 9 and 10:
Paper OverviewThe following papers
- Page 11 and 12:
AbstractTraditionally, projects ten
- Page 13 and 14:
alternative use. There are indicati
- Page 15 and 16:
1. Introduction1. IntroductionThis
- Page 17 and 18:
1. IntroductionFlexible projects ar
- Page 19 and 20:
1. IntroductionA literature review
- Page 21 and 22:
2. Study design2. Study designThe r
- Page 23 and 24:
2. Study designInformation Content
- Page 25 and 26:
3. Flexibility in different project
- Page 27 and 28:
3. Flexibility in different project
- Page 29 and 30:
3. Flexibility in different project
- Page 31 and 32:
4. Project stakeholders4. Project s
- Page 33 and 34:
4. Project stakeholdersmandatory qu
- Page 35 and 36:
4. Project stakeholdersBased on res
- Page 37 and 38:
5. Effectiveness and efficiency5. E
- Page 39 and 40:
5. Effectiveness and efficiencyconf
- Page 41 and 42:
5. Effectiveness and efficiencyDegr
- Page 43 and 44:
6. Project flexibility categorisati
- Page 45 and 46:
6. Project flexibility categorisati
- Page 47 and 48:
6. Project flexibility categorisati
- Page 49 and 50:
7. Conclusions7. ConclusionsThis th
- Page 51 and 52:
7. ConclusionsProject phasesFlexibi
- Page 53 and 54:
7. ConclusionsEnablersThis thesis r
- Page 55 and 56:
7. Conclusions16, Figure 17, and Fi
- Page 57 and 58:
7. Conclusions4. AbsorptionAbsorpti
- Page 59 and 60:
7. ConclusionsThere appears to be a
- Page 61 and 62:
ReferencesAbbot, A. & Banerji, K. 2
- Page 63 and 64:
Gareis, R. 2004. Maturity of the Pr
- Page 65 and 66:
Miller, R. & Lessard, D. 2000. The
- Page 67 and 68:
Part 2.
- Page 69 and 70:
Paper 1.Olsson, N.O.E. 2006. Manage
- Page 71 and 72:
N.O.E. Olsson / International Journ
- Page 73 and 74:
N.O.E. Olsson / International Journ
- Page 75 and 76:
N.O.E. Olsson / International Journ
- Page 77 and 78:
N.O.E. Olsson / International Journ
- Page 79 and 80:
Paper 2.Magnussen, O.M. & Olsson, N
- Page 81 and 82:
282 O.M. Magnussen, N.O.E. Olsson /
- Page 83 and 84:
284 O.M. Magnussen, N.O.E. Olsson /
- Page 85 and 86:
286 O.M. Magnussen, N.O.E. Olsson /
- Page 87 and 88:
288 O.M. Magnussen, N.O.E. Olsson /
- Page 89 and 90: Projects trapped in their freedom:
- Page 91 and 92: 1. IntroductionThe purpose of this
- Page 93 and 94: project phases: preparation, freezi
- Page 95 and 96: establish realistic cost and time f
- Page 97 and 98: 4. ResultsIn the following, the emp
- Page 99 and 100: lowered the quality but the volume
- Page 101 and 102: Percent ofproject onSize of remaini
- Page 103 and 104: flexibility is introduced by the us
- Page 105 and 106: 100 %First official estimateApprova
- Page 107 and 108: ReferencesAndersen, B., Fagerhaug,
- Page 109 and 110: Paper 4.Olsson, N.O.E. 2004. ‘Fle
- Page 111 and 112: The concept of project flexibilityF
- Page 113 and 114: 3. CONCLUSIONSWhat seems to be impl
- Page 115 and 116: Paper 5.Olsson, N.O.E. 2006. ‘Imp
- Page 117 and 118: 558 N. O. E. Olsson et al.ex-post s
- Page 119 and 120: 560 N. O. E. Olsson et al.Table 1.O
- Page 121 and 122: 562 N. O. E. Olsson et al.and actua
- Page 123 and 124: 564 N. O. E. Olsson et al.Table 3.
- Page 125 and 126: 566 N. O. E. Olsson et al.Table 7.S
- Page 127 and 128: 568 N. O. E. Olsson et al.with a wi
- Page 129 and 130: Paper 6.Henriksen, B., Olsson, N. &
- Page 131 and 132: In this paper we use the process an
- Page 133 and 134: PROCESS ANALYSIS IN THE PLANNING OF
- Page 135 and 136: final framework for expected patien
- Page 137 and 138: User involvement also generated exp
- Page 139: Paper 7.Olsson, N.O.E. & Samset, K.
- Page 157 and 158: uncertainty. External flexibility c
- Page 159 and 160: 5.2. Flexibility in decision proces
- Page 161 and 162: Degree of redundancySlackPrecisionC