3. Flexibility in different project phasesHighLow100 %10 %Degreeof freedom<strong>to</strong> manoeuvre.Percent of <strong>to</strong>talbudget100,0 %90,0 %80,0 %70,0 %60,0 %50,0 %40,0 %30,0 %20,0 %10,0 %Project0,0 %time0 10 20 30 40 50 60 70 80 90 100Decision100 %<strong>to</strong> financeFigure 3. The relative size of the reduction lists as a percentage of the <strong>to</strong>talbudget at different phases of the projects. N=19Another way of quantifying the remaining flexibility options at the time of finalapproval of projects is <strong>to</strong> look at the reduction lists and allocated reserves incombination. On average, the reduction lists amounted <strong>to</strong> 6% of the <strong>to</strong>tal projectbudget. At the same time, an average of 8% of the project budgets was allocated asreserves, <strong>to</strong> cover unexpected expenses. Adding these two types of flexibility gives anapproximate <strong>to</strong>tal remaining flexibility of 14% of the <strong>to</strong>tal budget at the time ofparliamentary approval. The remaining flexibility options ranging between 10% and15% of the <strong>to</strong>tal budget appeared <strong>to</strong> be manageable at the time of final projectapproval, measured by the relative size of reduction lists and allocated reserves.The Norwegian building and civil engineering contract, NS 8405 (Norsk bygge- oganleggskontrakt NS 8405 2004), states that a project owner cannot demand changesexceeding 15% of the <strong>to</strong>tal contract value. This value corresponds fairly well with theresults presented above.3.3 Flexibility visualisationsAccording <strong>to</strong> Eikeland (2001), a decision is within the room for manoeuvring if itdoes not violate the consequences of previous decisions. As shown in Figure 4, theneed for room for manoeuvring is within the actual room for manoeuvring in the earlyphase of projects (area A), but not during later parts of projects (area B). Eikeland(2001) also points out that a major challenge in project management is that the needfor room for manoeuvring is typically at its highest when the actual freedom formanoeuvring has already decreased significantly. Area B represents situations whensome stakeholders (for example, users or project owners) have a desired room formanoeuvring that is larger than the actual room. To satisfy the desire for adjustments,changes have <strong>to</strong> be made, because the adjustments violate previous decisions.14
3. Flexibility in different project phasesHighDegreeof freedom<strong>to</strong> manoeuvreAccumulated cost/Available information/Amendment costABDesiredroom formanoeuvringLowProject time, tt 1Figure 4. Consequences of different values of the uncertainty, significance ofdecisions and the degree of freedom <strong>to</strong> manoeuvre compared <strong>to</strong> the desired roomfor manoeuvring in different project phases. (Paper 7, fig. 6. Based on Eikeland2001: 40)With regard <strong>to</strong> Figure 4, this <strong>thesis</strong> has addressed two aspects. First, an attempt wasmade <strong>to</strong> quantify curves in the figure, as described earlier. Second, the work on the<strong>thesis</strong> has been a search for project management strategies that utilise the area shownas A. It should be noted that the critical measure is not necessarily the size of area Aand B, but the time t 1, when the curves for actual and desired freedom <strong>to</strong> manoeuvrecross. Area A actually represents a ‘flexibility surplus’ and area B a ‘flexibilityundersupply’.Based on product development projects, Midler (1995), Verganti (1999) and Bahrami& Evans (2005) identify strategies <strong>to</strong> increase area A and <strong>to</strong> reduce area B shown inFigure 4. The purpose is <strong>to</strong> avoid changes but <strong>to</strong> keep options open <strong>to</strong> satisfy as muchas possible of the anticipated need for manoeuvring. Midler (1995) describes amanagement strategy for concurrent engineering projects. First, early commitment isprevented while as much information as possible is gathered on the project. In thesecond phase, the project is locked as precisely as possible. Finally, at the end of theproject, speed is given maximum priority in order <strong>to</strong> solve the remaining technicalobstacles.Paper 1 and Paper 8 study observed flexibility in 18 projects. Most of these projectswere subject <strong>to</strong> changes, extensions and iterations, i.e. they were in area B in Figure 4.When analysing project flexibility over time, there was also need <strong>to</strong> make adistinction between planned and actual approaches <strong>to</strong> flexibility. Approaches <strong>to</strong>flexibility changed during the projects and the actual approaches were not necessarilythe same as the planned ones.Earlier in this chapter, it was noted that different stakeholders have differentperspectives on projects flexibility in different project phases. This leads <strong>to</strong> the next<strong>to</strong>pic: project stakeholders.15
- Page 1 and 2: ISBN 82-471-8121-5 (printed ver.)IS
- Page 3: Preface and AcknowledgementsThe wor
- Page 7 and 8: Table of ContentsPreface and Acknow
- Page 9 and 10: Paper OverviewThe following papers
- Page 11 and 12: AbstractTraditionally, projects ten
- Page 13 and 14: alternative use. There are indicati
- Page 15 and 16: 1. Introduction1. IntroductionThis
- Page 17 and 18: 1. IntroductionFlexible projects ar
- Page 19 and 20: 1. IntroductionA literature review
- Page 21 and 22: 2. Study design2. Study designThe r
- Page 23 and 24: 2. Study designInformation Content
- Page 25 and 26: 3. Flexibility in different project
- Page 27: 3. Flexibility in different project
- Page 31 and 32: 4. Project stakeholders4. Project s
- Page 33 and 34: 4. Project stakeholdersmandatory qu
- Page 35 and 36: 4. Project stakeholdersBased on res
- Page 37 and 38: 5. Effectiveness and efficiency5. E
- Page 39 and 40: 5. Effectiveness and efficiencyconf
- Page 41 and 42: 5. Effectiveness and efficiencyDegr
- Page 43 and 44: 6. Project flexibility categorisati
- Page 45 and 46: 6. Project flexibility categorisati
- Page 47 and 48: 6. Project flexibility categorisati
- Page 49 and 50: 7. Conclusions7. ConclusionsThis th
- Page 51 and 52: 7. ConclusionsProject phasesFlexibi
- Page 53 and 54: 7. ConclusionsEnablersThis thesis r
- Page 55 and 56: 7. Conclusions16, Figure 17, and Fi
- Page 57 and 58: 7. Conclusions4. AbsorptionAbsorpti
- Page 59 and 60: 7. ConclusionsThere appears to be a
- Page 61 and 62: ReferencesAbbot, A. & Banerji, K. 2
- Page 63 and 64: Gareis, R. 2004. Maturity of the Pr
- Page 65 and 66: Miller, R. & Lessard, D. 2000. The
- Page 67 and 68: Part 2.
- Page 69 and 70: Paper 1.Olsson, N.O.E. 2006. Manage
- Page 71 and 72: N.O.E. Olsson / International Journ
- Page 73 and 74: N.O.E. Olsson / International Journ
- Page 75 and 76: N.O.E. Olsson / International Journ
- Page 77 and 78: N.O.E. Olsson / International Journ
- Page 79 and 80:
Paper 2.Magnussen, O.M. & Olsson, N
- Page 81 and 82:
282 O.M. Magnussen, N.O.E. Olsson /
- Page 83 and 84:
284 O.M. Magnussen, N.O.E. Olsson /
- Page 85 and 86:
286 O.M. Magnussen, N.O.E. Olsson /
- Page 87 and 88:
288 O.M. Magnussen, N.O.E. Olsson /
- Page 89 and 90:
Projects trapped in their freedom:
- Page 91 and 92:
1. IntroductionThe purpose of this
- Page 93 and 94:
project phases: preparation, freezi
- Page 95 and 96:
establish realistic cost and time f
- Page 97 and 98:
4. ResultsIn the following, the emp
- Page 99 and 100:
lowered the quality but the volume
- Page 101 and 102:
Percent ofproject onSize of remaini
- Page 103 and 104:
flexibility is introduced by the us
- Page 105 and 106:
100 %First official estimateApprova
- Page 107 and 108:
ReferencesAndersen, B., Fagerhaug,
- Page 109 and 110:
Paper 4.Olsson, N.O.E. 2004. ‘Fle
- Page 111 and 112:
The concept of project flexibilityF
- Page 113 and 114:
3. CONCLUSIONSWhat seems to be impl
- Page 115 and 116:
Paper 5.Olsson, N.O.E. 2006. ‘Imp
- Page 117 and 118:
558 N. O. E. Olsson et al.ex-post s
- Page 119 and 120:
560 N. O. E. Olsson et al.Table 1.O
- Page 121 and 122:
562 N. O. E. Olsson et al.and actua
- Page 123 and 124:
564 N. O. E. Olsson et al.Table 3.
- Page 125 and 126:
566 N. O. E. Olsson et al.Table 7.S
- Page 127 and 128:
568 N. O. E. Olsson et al.with a wi
- Page 129 and 130:
Paper 6.Henriksen, B., Olsson, N. &
- Page 131 and 132:
In this paper we use the process an
- Page 133 and 134:
PROCESS ANALYSIS IN THE PLANNING OF
- Page 135 and 136:
final framework for expected patien
- Page 137 and 138:
User involvement also generated exp
- Page 139:
Paper 7.Olsson, N.O.E. & Samset, K.
- Page 155 and 156:
Project flexibility and front-end m
- Page 157 and 158:
uncertainty. External flexibility c
- Page 159 and 160:
5.2. Flexibility in decision proces
- Page 161 and 162: