4. Project stakeholdersBased on results presented in Paper 1 and Paper 3, Figure 7 indicates that the room forexternal flexibility decreases over time. As the project scope becomes clarified, therelative focus on internal flexibility increases. The analysis of scope reductionspresented in Paper 3 can be seen as an illustration of external flexibility. The shape ofthe right half of Figure 7 is based on these results, where external flexibility decreasesrapidly after the final approval of a project.Relative shareExternal flexibilityInternal flexibilityFront-endExecutionProjecttimeFigure 7. External and internal flexibility in a time perspective.21