10.07.2015 Views

cabarrus county board of commissioners regular meeting november ...

cabarrus county board of commissioners regular meeting november ...

cabarrus county board of commissioners regular meeting november ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

October 17, 2011 (Regular Meeting)Page07 CEMENT FIBER SID 26 14 TILE CONC/PLASTIC 6 02 WALL UNIT 208 MASONITE 25 15 ENAMEL/STAINLESS SHNG 9 03 CENTRAL* 509 WOOD ON SHTG* 26 16 CEMENT FIBER SHINGLE 5 04 PACKAGE ROOF 510 ALUM, VINYL 26 INTERIOR WALL 05 CHILLED WATER 511 CONCRETE BLOCK 24 01 MASNRY/MIN 612 STUCCO 26 02 WALLBRD/WD/METAL 9 STRUCTURAL FRAME13 STUCCO SYNTHETIC 29 03 PLASTER 22 01 NONE 014 DESIGN VINYL 27 04 PLYWOOD PANEL 18 02 WOOD FRAME* 315 BRD&BAT 12"/WD SHG 27 05 DRYWALL/SHEETROCK* 22 03 PREFABRICATED 116 LOG 29 06 CUSTOM INTERIOR 30 04 MASONRY 417 CEDAR, REDWOOD 28 INTERIOR FLOOR COVER 05 RNFRD CONC 818 SIDING MAXIMUM 33 01 NONE 0 06 STEEL 519 ULT BRICK/ IMAT STONE 27 02 PLYWD, LINM 2 07 FIREPROOF STEEL 1020 FACE BLOCK/COM. BRICK 29 03 CONC FINISHED 1 08 SPECIAL 1421 FACE BRICK 32 04 CONC COATED 2 CEILING & INSULATION22 STONE 47 05 ASPHALT TILE 2 01 SUS CEIL INS 423 CORR METAL HEAVY 14 06 RUBBER/CORK 7 02 SUS WALL INS 424 PREFAB METAL 18 07 VINYL TILE 5 03 SUS CL/WL INS 525 RNFR CONCRETE 39 08 SHEET VINYL 5 04 SUS NO INS 326 PRECAST PANEL 32 09 PINE/SOFT/LAM WOOD 8 05 NOT SUS CEIL 327 PREFIN METAL 50 10 TERRAZZO 15 06 NOT SUS WALL 328 GLASS/THRML 60 11 CERAMIC TILE 15 07 NT SUS CL/WL* 4ROOF STRUCTURE 12 HARDWOOD/HEART PINE 12 08 NT SUS NO IN 201 FLAT 4 13 PARQUET 12 09 ROOF INSUL 102 SHED 6 14 CARPET* 5 10 WALL INSUL 103 GABLE 8 15 HARD TILE 15 11 RF/WL INS 204 HIP 9 16 SEAMLESS COATING 7 12 NO CEIL INS 005 GAMBREL/MAN 10 17 PRECAST CONC 106 IRR/CTHRL 14 18 SLATE 2007 WOOD TRUSS* 08 19 MARBLE 38* Indicates the standard used for a 100 point structure.MODEL 05 - MULTI FAMILYUSE CODES 60, 61, 62, & 63 APARTMENTS ARTMENTSBATHROOM - POINTS SCHEDULEArea per Fixture PointsEnter total fixtures for entire building0 - 99 14100 - 149 12 Area per fixture = Total Heated Area*150 - 189 10 divided byTotal Number <strong>of</strong> Fixtures190 - 229 8230 - 269 7270 - 309 6310 - 349 5350 - 449 4450 - UP 3SIZE FACTOR INDEXDRAFTThe average unit size =HEATED AREA = SIZE FACTORNUMBER OF UNITSAverage Size UnitNo. <strong>of</strong> Unit 0 600 800 1000 1200Per Card to to to to to599 799 999 1199 MAX2 1.20 1.15 1.10 1.08 1.063 1.18 1.13 1.08 1.06 1.054 1.16 1.11 1.06 1.04 1.035 1.14 1.09 1.04 1.02 1.016 1.11 1.07 1.02 1.00 .997 1.08 1.05 1.00* .98 .978 1.05 1.03 .98 .96 .959 1.02 1.00 .96 .94 .9310 & up .99 .97 .94 .92 .91MARKET/DESIGN FACTORQUALITY ADJUSTMENT01 MARKET FACTOR 1 0.92 01 MINIMUM .7502 MARKET FACTOR 1 0.96 02 BELOW AVERAGE .9003 MARKET FACTOR 1* 1.00 03 AVERAGE* 1.0004 MARKET FACTOR 1 1.04 04 ABOVE AVERAGE 1.1005 MARKET FACTOR 1 1.06 05 ABOVE AVG/CUSTOM 1.30A-1Page 157

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!