10.07.2015 Views

cabarrus county board of commissioners regular meeting november ...

cabarrus county board of commissioners regular meeting november ...

cabarrus county board of commissioners regular meeting november ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

October 17, 2011 (Regular Meeting)Page6. Private Drive (PD) - Parcels have no state maintained access but havean established access drive or an easement less than 60 feet wide toproperty.7. Recorded Easements - Parcels that have no state maintained roadfrontage but have an easement 60 feet wide or greater should be givenfront footage in the amount <strong>of</strong> the easement and the road type should bebased on the road from which the easement intersects. Parcels witheasements less than 60 feet in width should be coded as Private Drive(PD).If the property owner owns adjoining land that has frontage use the accesscode <strong>of</strong> that street with 60 feet <strong>of</strong> frontage.Access (continued) INDUSTRIAL ACREAGE Land Model 06Code FactorRP -40 Rural paved is adjusted for lack <strong>of</strong> water and sewer.SP -40 Suburban paved is adjusted for lack <strong>of</strong> water and sewer.UP -40 Urban paved is adjusted for lack <strong>of</strong> water and sewer.IS -30 Interstate – minus for lack <strong>of</strong> water and sewer and plus forlocation.RD -45 Rural dirt is adjusted for lack <strong>of</strong> water, sewer and paving.SD -45 Suburban dirt is adjusted for lack <strong>of</strong> water, sewer and pavingUD -45 Urban dirt is adjusted for lack <strong>of</strong> water, sewer and pavingRG -45 Rural gravel is adjusted for lack <strong>of</strong> water, sewer and paving.RT -50 Privately Dirt Streets are adjusted for lack <strong>of</strong> water, sewer,paving and maintenance.DWRural Dirt Road - government maintained ned with water; see followingchartGW Rural Gravel Road - government ntmaintained with water; seefollowing chartPDPrivate Drive or easement (no public access); see following chartPSPaved with public water and sewer; see following chart.PWPaved with public water; see followingchartNXNo legal access to property. Thefollowing factors are to beapplied to parcels having no access in order to reduce both thebase price and the size factor influence.-see chart.No Legal Access (NX) No Public Access (PD) (PDAFPavedPaved with water (PW)0.01 - 1.5 Acres = - 65% 0.01 - 1.5 Acres = -50% 0.01 - 1.5 Acres = -35%1.51 - 3.0 Acres = - 64% 1.51 - 3.0 Acres = -50%1.51 - 3.0 Acres = -34%3.01 - 4.0 Acres = - 64% 3.01 - 4.0 Acres = -50%3.01 - 4.0 Acres = -33%4.01 - 5.0 Acres = - 63% 4.01 - 5.0 Acres =-50% 4.01 - 5.0 Acres = -32%5.01 - 6.0 Acres = - 63% 5.01 - 6.0 Acres =-50% 5.01 - 6.0 Acres = -31%6.01 - 7.0 Acres = - 62% 6.01 - 7.0Acres =-50% 6.01 - 7.0 Acres = -30%7.01 - 8.0 Acres = - 62% 7.01 - 8.0 Acres= -50% 7.01 - 8.0 Acres = -29%8.01 - 9.0 Acres = - 61% 8.01 - 9.0 Acres = -50% 8.01 - 9.0 Acres = -28%9.01 - 10.0 Acres = - 61% 9.01- 10.0 Acres = -50% 9.01 - 10.0 Acres = -27%10.01 - 15.0 Acres = -60% 10.01-15.0Acres = -50% 10.01 - 15.0 Acres = -26%15.01 - 30.0 Acres = -60% 15.01-30.0 Acres = -52% 15.01 - 30.0 Acres = -25%30.01 - 50.0 Acres = -60% 30.01- 50.0 Acres = -53% 30.01 - 50.0 Acres = -25%50.01 - 70.0 Acres = -60% 50.01-70.0 Acres = -54% 50.01 - 70.0 Acres = -24%70.01 -100.0 Acres = -60% 70.01-100.0 Acres = -55% 70.01 - 100.0 Acres = -23%100.01 -150.0 Acres = -60% 100.01- 50.0 Acres = -56% 100.01 - 150.0 Acres = -22%150.01 - Up Acres = -60% 150.01- Up Acres = -57% 150.01 - Up Acres = -21%DRAFTDirt road with water (DW) Gravel road with water (GW Paved with sewer (PS)0.01 - 1.5 Acres = -43% 0.01 - 1.5 Acres = -40% 0.01 - 1.5 Acres = -20%1.51 - 3.0 Acres = -43% 1.51 - 3.0 Acres = -39% 1.51 - 3.0 Acres = -18%3.01 - 4.0 Acres = -42% 3.01 - 4.0 Acres = -39% 3.01 - 4.0 Acres = -16%4.01 - 5.0 Acres = -42% 4.01 - 5.0 Acres = -38% 4.01 - 5.0 Acres = -14%5.01 - 6.0 Acres = -41% 5.01 - 6.0 Acres = -38% 5.01 - 6.0 Acres = -12%6.01 - 7.0 Acres = -40% 6.01 - 7.0 Acres = -37% 6.01 - 7.0 Acres = -10%7.01 - 8.0 Acres = -39% 7.01 - 8.0 Acres = -36% 7.01 - 8.0 Acres = -08%8.01 - 9.0 Acres = -38% 8.01 - 9.0 Acres = -35% 8.01 - 9.0 Acres = -06%9.01 -10.0 Acres = -37% 9.01 - 10.0 Acres = -34% 9.01 - 10.0 Acres = -04%10.01 -15.0 Acres = -36% 10.01 - 15.0 Acres = -33% 10.01 - 15.0 Acres = -02%15.01 - 30.0 Acres = -35% 15.01 - 30.0 Acres = -32% 15.01 - 30.0 Acres = +00%30.01 - 50.0 Acres = -35% 30.01 - 50.0 Acres = -32% 30.01 - 50.0 Acres = +00%50.01 - 70.0 Acres = -34% 50.01 - 70.0 Acres = -31% 50.01 - 70.0 Acres = +01%70.01 -100.0 Acres = -33% 70.01 - 100.0 Acres = -30% 70.01 - 100.0 Acres = +02%100.01 -150.0 Acres = -32% 100.01 - 150.0 Acres = -29% 100.01 - 150.0 Acres = +03%150.01 -Up Acres = -31% 150.01 - Up Acres = -28% 150.01 - Up Acres = +04%*Note - This chart is in the computer and automatically applied when LandModel 06 is used.E. Topography: INDUSTRIAL ACREAGE Land Model 06Land considered usable but suffering from rough topography may need furtheradjustment in order to achieve market value. Rough topography increases thedevelopment and building cost required to gain the optimum use from a parcel<strong>of</strong> land. The usable land on each parcel must be looked at as a whole andA-1Page 76

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!