10.07.2015 Views

cabarrus county board of commissioners regular meeting november ...

cabarrus county board of commissioners regular meeting november ...

cabarrus county board of commissioners regular meeting november ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

October 17, 2011 (Regular Meeting)PageMasonry 24B 10.00 9.00 8.00Frame 24 6.35 5.70 5.10Pole 24P 4.60 4.15 3.70Metal 24M 6.10 5.50 4.90Add to the Original % Condition for concrete floor: + 30%Add to the Original % Condition for electrical: + 10%Add to the Original % Condition for plumbing: + 10%Above Average – The structure is built with above average materials.Average – The structure is built with average materials.Below Average – The structure is built with below average materials.SHELTER - FARM (5% Depreciation) Hay or bulk storage, no walls and dirtfloor.Size Adjustment Table 1B C DDescription CODE Above Avg. Average Below Avg.Frame 97 4.90 3.50 2.70Pole 97P 3.70 2.75 2.15Metal 97M 6.40 4.50 3.25Add to the Original % Condition for concrete floor: + 50%Add to the Original % Condition for electrical: + 35%Add to the Original % Condition for plumbing: +35%SHELTER – PARK/PICNIC (5% Depreciation)Size Adjustment Table 2No walls and concrete floor.AA A BCD ECODE Excellent Custom Above Avg. Average Below Avg. MinimumMasonry SHB 35.00 29.00 23.0017.50 13.00 10.00Frame SHF 30.00 25.50 20.0014.00 11.00 8.50AAverMetal SHM 17.00 11.00 9.25 7.00Pole SHP 12.50 9.75 7.50Above Average– The structure is built with above average materials.Average – The structureis built with average materials.Below Average – The structure is built with below average materials.SHOP BUILDINGS (3% Depreciation)Size Adjustment Table 1DRAFTAA A B C D EDescription CODE Excellent Custom Above Avg. Average Below Avg. MinimumMasonry B6B 36.00 27.00 21.00 16.00 11.00 9.50Frame B6 27.00 20.25 15.75 12.00 8.50 7.10Pole B6P 23.60 17.70 13.80 10.50 7.50 6.30Metal B6M 26.00 19.40 15.00 11.50 8.50 6.90Add to the Original % Condition for Upper Story - 70%Add to the Original % Condition for ½ story - 35%SILOS – Farm(5% Depreciation)--------Upright-------- -----------------Trench------------------Diameter x HeightPer. Square FootQUALITY AA A B C D ECode Harvester Con Stave Con Wall/Flr. Block Con Floor Dirt28 $84.00 $29.00 $8.15 $6.85 $5.40 $2.30UprightA-1Page 183

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!