Exhibit ___ (EIOP-19)Page 124 of 684V C. NorthernArea SummaryKey drivers behind the transmission capacity related projects in this study area include thefollowing:• Refurbishment of several transmission lines.• The interconnection of several wind generation projects.Key sub-transmission and distribution drivers include the following:• Sub-transmission automation installations on Lines 21/23/26.A potential major driver for the area is the North Country Power Authority (NCPA) takeoverof the electrical system in portions of St. Lawrence and Franklin Counties.V - 10125