Exhibit ___ (EIOP-19)Page 91 of 684Pockets of Poor PerformanceThe analysis performed to address reliability concerns in small pockets along a feederhas been incorporated into the Engineering Reliability Review program, and thisprogram will be discontinued.Table IV-11Pockets of Poor PerformanceProgram Variance ($millions)CIP FY12 FY13 FY14 FY15 FY16 FY17 Total2011 0.6 0.7 0.8 0.8 0.9 - 3.8<strong>2012</strong> - - - - - - -Overhead Distribution FusingVarious projects are in place which will maintain customer reliability through theinstallation of fuses on overhead distribution lines. Fuses are installed to isolatepermanent faults on the distribution system. Ideally, these fuses are installed atlocations which limit the interruption to the fewest number of customers as possible.Proper fuse application will limit the duration of the interruption by isolating the fault to asmaller area and reducing the time required to find the fault.Drivers:Fuses isolate the faulted area of a feeder and thereby interrupt the smallest practicalnumber of customers. Outage restoration time may also be reduced since fusing willsplit the overhead circuit into smaller segments of the distribution system that requirespatrolling to locate the cause of an unplanned customer interruption.Customer Benefits:These projects will result in a reduction in the number of customer interruptions and willhelp the Company to continue to meet its service quality metrics.2011 to <strong>2012</strong> Variance:The Company has actively been installing fuses on its Worst Performing feeders as partof ERR evaluations. This program expands the scope of feeders being reviewed forincreased fusing opportunities across the service territory. The projected investment isshown in the table below. This program was not included in the 2011 CIP.Table IV-12Overhead Distribution FusingProgram Variance ($millions)CIP FY12 FY13 FY14 FY15 FY16 FY17 Total2011 - - - - - - -<strong>2012</strong> - 1.8 1.8 1.8 1.8 1.8 9.0IV-15 1592

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!