11.07.2015 Views

January 2012 Capital Investment - National Grid

January 2012 Capital Investment - National Grid

January 2012 Capital Investment - National Grid

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Exhibit ___ (EIOP-19)Page 67 of 6842011 to <strong>2012</strong> Variance:The projected investment is shown in the table below show a modest increase year onyear to account for forecasted load growth and inflation.Specific ProjectsTable III-7Capacity PlanningProgram Variance ($millions)CIP FY12 FY13 FY14 FY15 FY16 FY17 Total2011 1.5 3.8 4.0 4.9 4.4 - 18.5<strong>2012</strong> - 4.4 4.5 5.2 5.7 6.1 25.9Load Relief2011 0.1 0.1 0.1 0.1 0.1 - 0.6Blankets <strong>2012</strong> - 0.1 0.1 0.1 0.1 0.1 0.6Total2011 1.6 3.9 4.1 5.0 4.5 - 19.1<strong>2012</strong> - 4.5 4.6 5.3 5.8 6.3 26.4The following specific projects are estimated to have spending in excess of $1 million inany fiscal year:• Project C28892, Buffalo 23kV Reconductor - Huntley. This project will replacethe 1H, 2H, 3H and 13H cables from Sawyer Station to Buffalo Station 24.These cables have exceeded summer normal ratings in the past and mayexceed emergency ratings for loss of one cable.• Project C28893, Buffalo 23kV Reconductor - Huntley 2. This project will replacecable 11H from Sawyer Station to Buffalo Station 52. This cable has exceededsummer normal ratings in the past and may exceed emergency ratings for theloss of one of the other three supply cables.• Project C28903, Buffalo 23kV Reconductor - Kensington 2. This project willreplace the 10K cable from Kensington Terminal Station to Buffalo Station #28,the 11K and 12K cables from Kensington Terminal Station to Buffalo Station #32and the 15K cable from Kensington Terminal Station to Buffalo Station #27.These circuits currently exceed emergency ratings for the loss of one cable.• Project C28894, Buffalo 23kV Reconductor - Kensington. This project willreplace the 21K, 22K, 23K and 33K cables from the Kensington Terminal Stationto Buffalo Station #53. These circuits currently exceed emergency ratings for theloss of one cable.III-9 968

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!