11.07.2015 Views

January 2012 Capital Investment - National Grid

January 2012 Capital Investment - National Grid

January 2012 Capital Investment - National Grid

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Exhibit ___ (EIOP-19)Page 20 of 684<strong>Grid</strong> has estimated approximately $50 million dollars over a ten year period startingFY13 in the plan will be needed to address NERC Transmission Planning Standards(TPL).Northeast Region ReinforcementThis major program consists of reinforcements of the transmission system in theSaratoga and Glens Falls area of the Company’s Northeast Region. It is necessitatedby current thermal and voltage needs and area load growth in the Northeast Region. Itis also impacted by the proposed Luther Forest Technology Campus (“LFTC”).Currently, there are a number of major projects each with a total forecasted spendinglevel of $2 million or more under this program during the period covered by this Plan 1 ,including:• Installation of a new Eastover Road (formerly Turner Road) 230/115kVsubstation near where the existing Rotterdam-Bear Swamp 230kV line crossesthe existing Mohican-North Troy #3 line and the Battenkill-North Troy #10 115kVlines. This station would serve as a primary source to those 115kV lines servingthe east side of the Northeast Region. (Project #s C31326 - $20.9m & C31419 -$5.8m)• Installation of a new 115kV line parallel to the existing Spier Falls to Rotterdam#1 & #2 circuits. This line would reinforce the west side of the 115kV system thatserves the Northeast Region. An Article VII application has been submitted forapproval to construct this line under the title “Spier Falls to Rotterdam New115kV Transmission Project.” (Project # C31418 - $53.5m)• Rebuild the Mohican-Battenkill #3 and #15 lines between Mohican and Battenkillsubstations and reconductor 14.2 miles of the #15. This project requires anArticle VII application, which the Company intends to submit by spring 2011.(Project # C34528 - $30.2m)• Installation of reactive compensation at distribution and transmission substationsin the Northeast Region. (Project # C35773 – $2.2m)• In addition, studies indicate that reconductoring of 22.9 miles of existing 115 kVlines in the Northeast Region is required.The timing of some facets of this program (including the reconductoring of existing lines,and reactive compensation) depends on the actual load growth for the Northeast Region(Saratoga and Global Foundries) during the next 1-10 years. Other projects in theprogram are needed absent additional load growth to relieve exposure to existingperformance issues in the area. These include the new Spier-Rotterdam lines, EastoverRoad Station, and rebuilding the Mohican-Battenkill 115 kV lines.Drivers:The transmission system serving the Northeast Region is currently exposed to postcontingencythermal overloads during summer peak periods, including inadequate1 The dollars shown for projects below within this program are the spending forecasted for theproject within the term of this 5 year Plan (FY13-FY17), not the total capital cost for the projects.The same is true for all projects listed with dollars in this Plan.II-321

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!