11.07.2015 Views

January 2012 Capital Investment - National Grid

January 2012 Capital Investment - National Grid

January 2012 Capital Investment - National Grid

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Exhibit ___ (EIOP-19)Page 63 of 684Steel TowersThere are approximately 3,790 steel towers on the sub-transmission system, 3 themajority of which are 60-90 years old. Above ground inspection of towers andassociated equipment is coordinated through the Inspection and Maintenance Program,which also identifies towers that require further engineering analysis.Drivers:Corrosion is the natural life limiting failure mechanism for towers. Replacement is calledfor when it is more economic to replace the entire tower than to replace or performwelding repairs to a number of steel members. Alternatively, replacement may benecessary when it is no longer safe to work on the tower.Customer Benefits:Maintaining Reliability by preventing tower failures which may result in customerinterruptions is the key driver for this program.2011 to <strong>2012</strong> Variance:The projected program investment is shown in the table below.Table III-4Steel TowerProgram Variance ($millions)CIP FY12 FY13 FY14 FY15 FY16 FY17 Total2011 0.9 1.8 1.8 1.8 1.8 - 8.0<strong>2012</strong> - 1.8 1.8 1.8 1.8 1.8 8.83 Report on the Condition of Physical Elements of Transmission and Distribution Systems, Case06-M-0878, October 1, 2011, page II-80.III-5 564

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!