Exhibit ___ (EIOP-19)Page 132 of 684V E. Utica RomeArea SummaryThe drivers behind the transmission capacity related projects in this study area are:•• Other issues found in this area are addressed by operational solutions.The drivers behind the sub-transmission and distribution projects in this study area are:• Replacement of metalclad switchgear at Onieda.V - 18133