Exhibit ___ (EIOP-19)Page 96 of 6842011 to <strong>2012</strong> Variance:The projected investment is shown in the table below. This program was not funded inthe 2011 CIP.Table IV-14Advanced <strong>Grid</strong> ApplicationsProgram Variance ($millions)CIP FY12 FY13 FY14 FY15 FY16 FY17 Total2011 - - - - - - -<strong>2012</strong> - - 5.0 5.0 5.0 5.0 20.0The scope and schedule of this project is still under conceptual review and is not yet aline item in the Plan. The Company is currently managing this item by evaluatingfunding shifts within the Plan considering reserves, and program placeholders forreactionary reliability issues such as Engineering Reliability Review.The following specific projects will exceed $1 million in any fiscal year:• Project Candidate, AGA, Clifton Park Area. This project will includeapproximately twelve 13.2kV feeders from multiple substations serving between22,000 to 25,000 customers and approximately 80 MW of load. Approximately60 advanced distribution automation switches and 50 advanced capacitor bankswill be installed along with a small number of both feeder and transformermonitors. This project is expected to improve feeder reliability, power factor andvoltage performance within the scope of the project. This location was identifieddue to the expected availability of a high bandwidth communications systembeing installed as part of the NY-ISO Capacitor Project.IV-20 2097

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!