Exhibit ___ (EIOP-19)Page 84 of 684reduce the likelihood that an unacceptable number of customers will be without servicefor extended periods due to supply, substation equipment or feeder contingencies.2011 to <strong>2012</strong> Variance:The projected investment is shown in the table below and slightly increasing spend isforecasted year on year to account for forecasted load growth and inflation.Specific ProjectsTable IV-6Capacity PlanningProgram Variance ($millions)CIP FY12 FY13 FY14 FY15 FY16 FY17 Total2011 14.5 15.4 16.1 19.7 20.2 - 85.9<strong>2012</strong> - 15.3 22.5 22.4 21.3 21.3 102.9Load Relief2011 1.4 1.5 1.6 1.6 1.7 - 7.8Blankets <strong>2012</strong> - 1.5 1.6 1.6 1.7 1.7 8.1Total2011 15.9 16.9 17.6 21.4 21.9 - 93.7<strong>2012</strong> - 16.8 24.1 24.1 23.0 23.1 111.0The following specific projects are forecasted with planned spending in excess of $1million in any fiscal year:• Project C28831, North Syracuse Area Capacity Increase. This project providesfor the installation of a new 115/13.8kV substation to relieve area transformersand distribution feeders that are projected to exceed their thermal ratings byCY<strong>2012</strong>.• Project C28929, Frankhauser New Station - Line Work. Line work associatedwith project C36520 described above.• Project C29186, Station 214 - Second Transformer Addition. This project willresolve the existing loading above summer normal rating of the existingtransformer.• Project C29187, Station 214 New F21466/67. Line work associated with ProjectC29186 to provide relief to stations and feeders in the vicinity of Station 214.• Project C30506, North Syracuse Area Substation Getaways. This projectprovides for the installation of distribution feeder getaways in support of ProjectC28831, described above.• Project C32495, Paloma Substation Second Transformer Addition. This projectprovides for a second substation transformer and switchgear. The existingtransformer is projected to exceed its summer normal rating in 2015 and also hasexisting MWHr Violations.• Project C32496, Harris Substation Second Transformer Addition. This projectwill resolve loading above summer normal ratings of the Milton Ave. Stationtransformer in 2014 as well as MWHr criteria violations for contingency loss ofthe existing Harris Ave. substation transformer.IV-8 885

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!