11.07.2015 Views

January 2012 Capital Investment - National Grid

January 2012 Capital Investment - National Grid

January 2012 Capital Investment - National Grid

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Exhibit ___ (EIOP-19)Page 46 of 684from a maintenance standpoint as the configuration makes tasks such as disconnectrepair or replacement difficult due to problems maintaining safe working clearances.Additional switching necessary for safe working clearance for workers weakens thesystem under certain contingencies. The # 3 and # 4 transformers do not have 115kV“high side” circuit breaking devices resulting in clearing the 115 kV bus for operation ofthe transformer or feeder backup protection. A majority of the 115 kV structurefoundations are failing and need repair or replacement.One of the 115 kV circuit breakers is a 1961 vintage Westinghouse GM-6B. This breakermodel has a complex arcing chamber and has on multiple occasions seen highresistance forming in the contacts. These breakers are being replaced on a system widebasis (see circuit breaker replacement strategy).The 13.8kV switchgear is a 1965 vintage Allis Chalmers and the arc chutes areasbestos. Tubing on the circuit breakers has failed resulting in the circuit breakers notbeing able to interrupt parallel load current. Parts for the circuit breakers are no longeravailable. The switchgear building is rusting, with settling making it difficult to open someof the switchgear doors and rack and draw out the circuit breakers. In order to replacethe # 3 transformer after failure, some of the bus duct was removed and replaced withcables. These cables were installed as an emergency repair. There are no facilities toadequately support or protect these cables.Conceptual engineering for the Oneida Station rebuild was completed in May 2010. ThePhase One work was returned to conceptual engineering for a change of scope in themetal-clad design and sanctioned in September 2011. Phase One construction isscheduled for completion in FY13 and the 115kV yard rebuild that is Phase Two isscheduled to start after FY16.Rotterdam (C34850) $0.1mRotterdam is a large station with 230kV, 115kV, 69kV, 34.5kV and 13.2kV sectionsspread out over multiple tiers on a hillside. The 230kV yard is the main source forSchenectady, Saratoga and Warren counties. Rotterdam is supplied from the PorterLines #30 and #31 and from Bear Swamp on the E205 line to Massachusetts. Asdiscussed in the 2011 Asset Condition Report, the 230kV yard has had performanceissues and there have been three (R23, R24 and R84) catastrophic failures of FederalPacific Electric RHE breakers. Two of the three 230kV auto transformers #7 and #8 havea higher than normal failure likelihood due to their design; specifically due to “T” beamheating and static electrification. There has also been an issue with capacitor bank #4tripping off line on differential protection if capacitor bank #3 is put into service whilecapacitor bank #4 is on line. 17The 115kV circuit breakers at Rotterdam are a mixture of Westinghouse, McGrawEdison, Allis-Chalmers, General Electric, and ABB. The disconnect switches aredeteriorated and many have had problems in the past with breaking or not operatingcorrectly. The original 115kV yard has multiple foundation problems with listing pads17 Report on the Condition of Physical Elements of Transmission and Distribution Systems,” October 1,2009, Page III-73 and III-74.II-2947

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!