11.07.2015 Views

January 2012 Capital Investment - National Grid

January 2012 Capital Investment - National Grid

January 2012 Capital Investment - National Grid

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Exhibit ___ (EIOP-19)Page 92 of 684Arc Flash Mediation - 480V Spot NetworksThis strategy intends to install primary and secondary isolation devices in spot networksystems to mitigate arc flash hazard levels within 480V spot network systems.Drivers:The recently published <strong>2012</strong> <strong>National</strong> Electric Safety Code requires that an arc hazardanalysis be completed on the 480V spot networks operated by the Company. TheCompany’s analysis indicates that the potential incident energy for various faultsscenarios on a spot network could exceed the rating of current personal protectiveequipment. To ensure worker safety, new work methods will need to be employed.These work methods may require significant switching and customer outages for routinemaintenance. The Company will be implementing these work methods immediately andis investigating engineering controls such as the addition of isolating switches on boththe primary and secondary side of its 330 spot network protectors.Customer Benefits:Installation of primary and secondary isolation equipment will facilitate emergency androutine maintenance without interruption of service to the customer.2011 to <strong>2012</strong> Variance:The projected investment is shown in the table below. This program was not included inthe 2011 CIP.Table IV-13Arc Flash Mediation - 480V Spot Networks Program Variance ($millions)CIP FY12 FY13 FY14 FY15 FY16 FY17 Total2011 - - - - - - -<strong>2012</strong> - 0.2 4.0 4.0 4.0 4.0 16.2IV-16 1693

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!