11.07.2015 Views

January 2012 Capital Investment - National Grid

January 2012 Capital Investment - National Grid

January 2012 Capital Investment - National Grid

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Exhibit ___ (EIOP-19)Page 82 of 684IV C. System Capacity and PerformanceThe projected investment for distribution work in the system capacity and performancespending rationale over the Plan period is shown in Table IV-6 below. The majority ofthe investment in FY13 and FY14 is for specific projects while later year investmentlevels are based on historical spending levels.2011 to <strong>2012</strong> Variance:The forecasted investment levels represent the cash flow of specific projects in the earlyyears of the plan and an expectation that capacity increases of similar magnitude will berequired throughout the plan based on forecasted load growth.Table IV-5System Capacity and PerformanceVariance Summary ($millions)CIP FY12 FY13 FY14 FY15 FY16 FY17 Total2011 43.5 50.7 54.9 54.5 54.9 - 258.4<strong>2012</strong> - 43.1 52.1 53.4 55.3 56.2 260.1Aside from blanket and program related projects, the following specific projects areproposed under this spending rationale and exceed $1 million in any fiscal year:• Project C36188, East Malloy Substation Second Transformer Addition. Thisproject provides for the resolution of MWHr Violations for contingency loss of theexisting substation transformer.• Project C33636, Buffalo Albany Flying Grounds Switch Replacement. Thisproject provides for the removal of Flying Ground Switches as a powertransformer protection method and replaces them with Circuit Switchers.• Project CD0016, Albany Network Study Construction. This project installsapproximately 9,700 feet of secondary cable, installs manhole ring busses andcable limiters.• Project CD0187, Spier-Rotterdam Project Distribution Relocations. This projectrelocates various distribution feeders to allow the construction of a new 115 kVline from Spier to Rotterdam due to load increases in the Northeast area.• Project Candidate, East Malloy Low Side Substation Equipment. This projectprovides for the 15kV station equipment associated with project C36188.• Project Candidate, Fly Road Low Side Feeder Getaways. This project providesfor the distribution line work associated with the expansion of Fly Road (PPM13999, 09252).IV-6 683

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!