Exhibit ___ (EIOP-19)Page 43 of 684Table II-16Transmission – Shield Wire Replacement StrategyProgram Variance ($million)CIP FY12 FY13 FY14 FY15 FY16 FY17 Total2011 7.6 4.9 0.6 2.0 0 - 15.1<strong>2012</strong> - 2.4 2.6 0.0 0.0 0.0 5.0Steel Tower StrategyThis program (C21693) addresses steel towers whose condition no longer meets thegoverning code requirements.Drivers:Pursuant to the 2005 Safety Order (Case 04-M-0159), the Company is required toassure its transmission lines meet the governing NESC under which they were built.The order instructed the Company to replace wood poles and steel structures that nolonger meet the governing code requirements. There are 20,325 steel structures (17,448towers and 2,877 poles) in service across the service territory.At the time the Steel Tower Strategy was written, four failures of steel structures wereattributable to poor condition and since the Strategy was written, another two failuresoccurred as described in the 2011 Asset Condition Report. The deteriorated condition ofcertain steel tower facilities raises safety and reliability concerns, particularly with thetowers on the 115kV transmission system.Customer Benefits:Outside of the indirect reliability benefits, public safety is the main benefit of the SteelTower Strategy. Replacing deteriorated structures, especially those adjacent to roads,railroads, and navigable waterways, enhances public safety. Not all deteriorating towersneed to be replaced, however. If the structures with “sound rust” are painted using aquality priming system and finishing coat, it is reasonable to expect that life could beextended by an additional 10 years which reduces the cost impact to customers.2011 to <strong>2012</strong> Variance:The South Oswego – Lighthouse Hill project is the last remaining project in this strategy.The work on this project commenced in FY12. A condition assessment is scheduled forFY17 for the Mountain-Lockport 103 (T1620) and Beck-Lockport 104 (T1060) lines. Inaddition, steel structures will be assessed in conjunction with line refurbishment projects.II-2644

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!