11.07.2015 Views

New! - Norman Equipment Co.

New! - Norman Equipment Co.

New! - Norman Equipment Co.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ZS75 INSTALLATION DETAILSPRE-TENSIONING ADJUSTMENTTo ensure positive-break operation, the switch should bepinned through the holes shown (1). The trip-wire should bepre-tensioned to the point where the linear switch actuatingcam is in the middle position (3). The standard 395N axialpulling force required for pre-tensioning can be reduced byadjusting the grooved nut (2). For trip-wire spans of less than30m, the unit can be supplied with lighter force pre-tensioningsprings.PRE-TENSIONING FORCE VS. ACTUATION FORCEThe actuating force is a function of the:• trip-wire span• pre-tensioning spring• set pre-tensioning forceas shown. Units are available with lighter springs fortrip-wire spans of less than 30m. Please seeordering details under AVAILABLE OPTIONS.4113

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!