11.07.2015 Views

New! - Norman Equipment Co.

New! - Norman Equipment Co.

New! - Norman Equipment Co.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SERIES SE ORDERING & ASSEMBLY INFORMATIONAVAILABLE SUBASSEMBLY COMPONENTSParts required for a system are:Aluminum profile, rubber profile,sensor set and safety controllerAluminum ProfileSE-AL10-1250SE-AL10-2500SE-AL12-1250SE-AL12-2500SE-AL20-1250SE-AL20-2500SE-AL22-1250SE-AL22-2500Description1.25 m2.50 m1.25 m2.50 m1.25 m2.50 m1.25 m2.50 mRubber ProfileDescriptionSE- P 40 - 1250 mm SE-P40 - 1250SE- P 40 - 2500 mmSE-P40 - 2500SE- P 70 - 1250 mmSE-P70 - 1250SE- P 70 - 2500 mmSE-P70 - 2500Sensor SetDescriptionSE- SETSE - T Transmitter &SE - R ReceiverSafety <strong>Co</strong>ntrollerDescriptionSE- 100C(2 Bumpers)Safety <strong>Co</strong>ntrol Category 1SE- 400CSafety <strong>Co</strong>ntrol Category 4Safety <strong>Co</strong>ntrol Category 3SE- 304C(Please contact(4 Bumpers)factory for details)AccessoriesDescriptionSE- EC 40 (2 required) End Cap for SE - P 40SE- EC 70 (2 required) End Cap for SE - P 70SE- SCRubber profile shearsSE- WAWiring aidSE- J1Junction Box}}} P70}}AL 10 & AL 12 for use with P40 rubber profile.AL 20 & AL 22 for use with P70 rubber profileP40 Rubber profile for use with AL 10 & AL 12 mounting rail.Rubber profile for use with AL 20 & AL 22 mounting rail.1CutSix steps to install the safety edgealuminum railto desired lengthand fasten in place4Pressthetransmitter andreceiver unitsinto the ends ofthe rubberprofile2Cutthe rubberprofile to desiredlength5Threademitter or receiver cable throughprofile to desired cable exit end of rubberprofile.3Clipthe rubberprofile into thealuminum rail6<strong>Co</strong>nnectto the desired safety controllerIt is ready !8319

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!