12.07.2015 Views

Code of Practice for Safe Use and Operation of Suspended Working ...

Code of Practice for Safe Use and Operation of Suspended Working ...

Code of Practice for Safe Use and Operation of Suspended Working ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(c)(d)(e)(f)(g)in case <strong>of</strong> a temporary suspended working plat<strong>for</strong>m, method <strong>of</strong>assembly <strong>and</strong> the safety precautions to note;instructions concerning actions the operative must take if thesecondary device is released;instructions <strong>for</strong> fault identification such as malfunction in brakeapplication, defect <strong>of</strong> hoisting wire rope, etc., <strong>and</strong> the remedial actionto be taken <strong>for</strong> the safe l<strong>and</strong>ing <strong>of</strong> the suspended working plat<strong>for</strong>m;in case where anchorage points are provided in the working plat<strong>for</strong>m<strong>for</strong> securing the lanyards <strong>of</strong> safety harnesses, a diagram <strong>of</strong> theworking plat<strong>for</strong>m to show the position <strong>of</strong> the anchorage or fittings <strong>for</strong>such purpose;safety precautions <strong>for</strong> hazardous trade processes to be carried outin the working plat<strong>for</strong>m such as welding or use <strong>of</strong> flammablesubstance; <strong>and</strong>(h) procedure <strong>for</strong> the ‘out <strong>of</strong> service’ position .9.2.3 The in<strong>for</strong>mation relating to the use <strong>of</strong> the suspended working plat<strong>for</strong>mshould include the following:(a)(b)(c)(d)(e)(f)description <strong>of</strong> manual controls;means <strong>for</strong> stopping <strong>and</strong> emergency stopping;description <strong>of</strong> how to operate the no-power descent <strong>and</strong> the automaticsafety device;nature <strong>and</strong> frequency <strong>of</strong> inspections;in case <strong>of</strong> a temporary suspended working plat<strong>for</strong>m, a plan to showthe requirement <strong>and</strong> method <strong>of</strong> anchorage <strong>and</strong> its erection <strong>and</strong>dismantling procedure; <strong>and</strong>drawings <strong>and</strong> diagrams enabling maintenance personnel to carrythe on-site maintenance, periodic maintenance <strong>and</strong> preventivemaintenance.55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!