12.07.2015 Views

Plant 44 Audit Reports - Wright-Patterson Air Force Base

Plant 44 Audit Reports - Wright-Patterson Air Force Base

Plant 44 Audit Reports - Wright-Patterson Air Force Base

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FOR OFFICIAL USE ONLYDistribution authorized to DoD components and their contractors only; administrative/operational use;March 16, 2006. Other requests for this document shall be referred to the Chief, AcquisitionEnvironmental Safety & Health Division, Engineering Directorate, ASCIENV, <strong>Wright</strong> <strong>Patterson</strong> <strong>Air</strong> <strong>Force</strong><strong>Base</strong>, OH 45433AFP <strong>44</strong> FACILITY REVIEWRAYTHEON SYSTEMS COMPANY13-16 Mar 2006FIRE PROTECTION1. PURPOSEThe intent of this facility review was to examine the inspection and testing program forfire protection systems, review the status of the corrective actions on last year's findingsand identify potential fire protection problems during a walk through of the facilities.2. FIRE PROTECTION SYSTEM INSPECTION AND MAINTENANCERECORDSRecords for the most part are centrally kept with the inspectors and are in good ordershowing that periodic testing and inspections per NFPA are being accomplished.Observation: When problems are encountered during inspections or testing that can notbe corrected on the spot, we recommend listing the work order number that is issued tocorrect the problem. The work order (or project) number should be carried through inrecords for subsequent inspecting/testing intervals until fixed. This was a hit or mississue during random record checks of PlY or sectional valve testing.Observation: Emergency lighting and fire exit sign testing/maintenance is an electricshop function. Recommend the fire inspectors do periodic random fire exit sign andemergency light testing on their area walk through to ensure that this work is beingaccomplished. Emergency lights in some facilities are built into normal ceiling lightfixtures and were hard to identify during the walk through. Recommend marking thosefixtures in some way to identify their locations. Also recommend taking advantage ofany facility power outages and accomplish a walk through as necessary to ensureemergency light and exit sign coverage is adequate.3. PREVIOUS FACILITY REVIEW CORRECTIVE ACTION STATUSNot all ofthe corrective actions taken as a result of our 2004 facility review findings werefield verified but of those reviewed, the actions were adequate with exception ofthefollowing clarifications.3.1 FACO Bldg 852 sprinklers too low. Clarification - recommend raising sprinklerheads in South corridor to suspended ceiling level.Attachment 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!