12.07.2015 Views

Plant 44 Audit Reports - Wright-Patterson Air Force Base

Plant 44 Audit Reports - Wright-Patterson Air Force Base

Plant 44 Audit Reports - Wright-Patterson Air Force Base

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FOR OFFICIAL USE ONLYDistribution authorized to DoD components and their contractors only; administrative/operational use;March 16, 2006. Other requests for this document shall be referred to the Chief, AcquisitionEnvironmental Safety & Health Division, Engineering Directorate, ASCIENV, <strong>Wright</strong> <strong>Patterson</strong> <strong>Air</strong> <strong>Force</strong><strong>Base</strong>, OH 45433AFP <strong>44</strong> ANNUAL FACILITIES REVIEWNORMAL MAINTENANCE REVIEW13-16 March 20061. PURPOSEThe purpose of this year's review was to: (I) assess the overall appearance and conditionof the real property, (2) detennine the adequacy of action taken as result of last year'sfindings and/or recommendations, and (3) assess Raytheon's effectiveness inaccompl ishing nonnal maintenance of real property.2. OVERALL APPEARANCE AND CONDITIONa. Housekeeping The plant appearance remains outstanding. The generalhousekeeping in and around the plant facilities appears to receive a adequate attention atall levels. Raytheon and its employees continue to maintain a clean and safe plantsite.b. Corrosion Control The attention to facility corrosion control and prevention isadequate to maintain the condition of the plant equipment and facilities. Several areaswere found to require additional attention to corrosion control.c. Roof Maintenance The plant roofs are generally being maintained in anacceptable manner.d. Pavement Maintenance The plant pavements are generally being maintained inan acceptable manner. There are several areas around the plantsite that need attention. Acomprehensive plan for maintaining the paved areas needs to be developed. This planneeds to include both normal maintenance tasks and projected CTR projects.3. ASSESSMENT OF NORMAL MAINTENANCEa. Building 801: A walk-through of the building was accomplished. Only minorfacility maintenance discrepancies were noted. The following maintenance concernswere noted:i. Numerous areas where the roof edges need to be maintained/repaired were noted.Several of the areas also have blistering near the edges.ii. Several electrical panels were found in various locations around the building thathad un~readable and/or no panel schedules attached.iii. A break room near column HI-21 needs wall and floor tile repairs and the wallsneed to be re-painted.iv. Several of the fire sprinkler riser closets need debris cleaned out and some neednew door hardware.Attachment 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!