Plant 44 Audit Reports - Wright-Patterson Air Force Base

Plant 44 Audit Reports - Wright-Patterson Air Force Base

Plant 44 Audit Reports - Wright-Patterson Air Force Base

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ii. Exterior wall is damaged and birds have been attacking the exposedinsulation.aa. Building 864 A walk-through of the building was accomplished. The followingfacility housekeeping and maintenance discrepancies were noted:i. Electric panel L3N-I 0 I is missing screws holding front panel on cabinet.bb.BuiJding 865 A walk-through of the building was accomplished. Building 865 isa small building (280 SF) built in 1975 and utilized for TOW testing. In 2002 thisbuilding was found to have numerous discrepancies caused by a lack of normalmaintenance. The necessary maintenance work has been completed and this facility isgreatly improved.CC. Building 868 A walk-through ofthe building was accomplished. The followingfacility housekeeping and maintenance discrepancies were noted:i. Florescent lights in Bay 3 need to be repaired. Replace burned light socket.ii. Concrete block wall at the end of North Test Cell needs to be sealed.Moisture is causing the block to deteriorate.dd.Building 870 A walk-through of the building was accomplished. The followingfacility housekeeping and maintenance discrepancies were noted:i. The building occupant has a problem with a roof leak along the joint wherethe existing building and the new addition connect.ii. Also a minor roof leak in the new office area.4. IMPLEMENTATION OF THE NORMAL MAINTENANCE PLAN: Jt isevident that Raytheon is doing an outstanding job of maintaining the plant. The softwarepackage, FAMIS, which was procured to handle the maintenance planning functions, hasgreatly improved the effectiveness ofthe Preventative Maintenance Program.5. CONCLUSION: Raytheon is commended for their responsiveness in correctingdeficiencies identified during this visit. In many cases the deficiencies were corrected onthe spot, or within 24 hours of the finding. Special thanks to Mr. Bob Booth and Mr.Nick Cajero for the exceptional job in taking corrective action on all the special FacilitiesReview Work Orders that were called in during the facility review. Raytheon is doing anexcellent job maintaining the facilities. <strong>Air</strong> <strong>Force</strong> <strong>Plant</strong> <strong>44</strong> is looking good and it appearsthat the employees take pride in their workplace.RICHARD A. SPOTTSAFP <strong>44</strong> Supervising EngineerAcquisition Environmental, Safety& Health Division, Engineering DirectorateAttachment 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!