12.07.2015 Views

Plant 44 Audit Reports - Wright-Patterson Air Force Base

Plant 44 Audit Reports - Wright-Patterson Air Force Base

Plant 44 Audit Reports - Wright-Patterson Air Force Base

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

•FOR OFFICIAL USE ONLYDistribution authorized to DoD components and their contractors only; administrative/operational use;19,2005. Other requests for this document shall be referred to the Chief, Acquisition Environmental SafetyHealth Division, Engineering Directorate, ASC/ENV, <strong>Wright</strong> <strong>Patterson</strong> <strong>Air</strong> <strong>Force</strong> <strong>Base</strong>, OH 4543305-03 BId 864 near Door 864-14 an LPS wire had sharp 90 degree bend. According toAFl 32-1065:A4.1.5. Down conductors must not have sharp bends or loops. All bends musthave a radius of203 millimeters (8 inches) or greater and measure not less than90 degrees from the inside ofthe bend. The 203-millimeter radius does not applyto "T" or "Y" splices. These splices. however, can be used only for the purposeintended.000 4145.26M refers contractor to NFPA standards. Contained in NFPA 780-1<strong>44</strong>.9.5 Conductor Bends. No bend ofa conductor shallform an included angle ofless than 90 degrees, nor shall it have a radius ofbend less than 203 mm (8 in.),as shown in Figure 4.9.5.Ra

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!