12.07.2015 Views

Plant 44 Audit Reports - Wright-Patterson Air Force Base

Plant 44 Audit Reports - Wright-Patterson Air Force Base

Plant 44 Audit Reports - Wright-Patterson Air Force Base

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

•FOR OFFICIAL USE ONLYDistribution authorized to DoD components and their contractors only; administrative/operational use;March 16, 2006. Other requests for this document shall be referred to the Chief, AcquisitionEnvironmental Safety & Health Division, Engineering Directorate, ASCIENV, <strong>Wright</strong> <strong>Patterson</strong> <strong>Air</strong> <strong>Force</strong><strong>Base</strong>, OR 45433u. Building 854 A walk-through of the building was accomplished and no facilitymaintenance or housekeeping discrepancies were noted..v. Building 855 A walk-through of the building was accomplished and no facilitymaintenance or housekeeping discrepancies were noted.w. Building 856 A walk-through of the building was accomplished and no facilitymaintenance or housekeeping discrepancies were noted.x. Building 862 A walk-through ofthe building was accomplished. The followingfacility housekeeping and maintenance discrepancies were noted:i. Equipment/carts were improperly stored on top of HVAC duct work.ii. The roof ofthe underground test cell (currently used for storage) needs roofmaintenance done. Re-coat the roof with an appropriate roof coating material.y. Building 864 A walk-through of the building was accomplished. The followingfacility housekeeping and maintenance discrepancies were noted:i. A temperature and humidity sensor mounted on the wall in the test bay is nolonger used and needs to be removed (repeat).ii. The wall-roofjoint on the fuel pump house is badly cracked and needs to berepaired.(repeat)z. Building 865 A walk-through ofthe building was accomplished. Nohousekeeping or maintenance discrepancies were noted.aa. Building 866 A walk-through ofthe building was accomplished. Nohousekeeping or maintenance discrepancies were noted.bb. Building 868 A walk-through ofthe building was accomplished. The followingfacility housekeeping and maintenance discrepancies were noted:i. The exterior of the building has been painted. The painting was done in avery haphazard, sloppy fashion with large amounts of overspray.cc. Building 870 A walk-through of the building was accomplished. Nohousekeeping or maintenance discrepancies were noted.4. IMPLEMENTATION OF THE NORMAL MAINTENANCE PLAN: It isevident that Raytheon is doing an adequate job of maintaining the plant. The softwarepackage, FAMIS, which was procured to handle the maintenance planning functions, hasbeen replaced with a new system called "Prism" by SAP.Attachment 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!