12.07.2015 Views

Plant 44 Audit Reports - Wright-Patterson Air Force Base

Plant 44 Audit Reports - Wright-Patterson Air Force Base

Plant 44 Audit Reports - Wright-Patterson Air Force Base

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.4.2. Building 80 I, room G 1315. This is the HVAC shop that has a wall that does notmeet the ceiling. The wall should be completed to the ceiling to minimize the possibilityof a fire from migrating from one area to the next.4.4.3. Building 849, the northwest stairwell is still being used for storage under the stairs.4.4.4. Building 830, near column D2. Plastic sheeting is being used to divide work areas.This should be removed or replaced with a more permanent non combustible materiel.4.4.5. There are numerous escutcheon plates loose or missing from sprinkler heads in thefollowing areas;Building 80 I, operations office near column D IBuilding 80 I, near column K20Building 80 I, RAM area near column N8Building 80 I, Standard Missile area near column M 14-16Building 849, first floorBuilding 827c, room A0700A4.4.6. Sprinklers are drooping and the hangars should be re-adjusted in the followingareas: Building 801 near column K20 and in the RAM area near column N8; Also thefirst floor of building 849.4.5 New ConstructionA considerable amount of new construction has taken place since the last visit. Building810 has a new foyer, Building 817 has been renovated, and a new shipping and receivingarea was completed in Building 801. Building 827C is currently undergoing majorchanges. It appears all new work is being accomplished with the proper fire protection.The only question is the new receiving and shipping area in Building 801. We could notascertain if the proper fire separation was provided between the receiving/shipping areaand the rest of Building 801. The plans should be reviewed and ensure a minimum ofonehour fire rated walls are provided and all openings are appropriately protected with rateddoors and frames.4.6 General CommentsThe fire station, Building 828, could use a major upgrade. The facility is inefficient andlacks the necessary space for training and other briefings. In addition locker space is at apremium for the number of personnel in the building. As time and funds permit, the firestation should be renovated to meet current fire station standards.5. RECOMMMENDATIONRaytheon takes the necessary steps to correct the items identified in paragraphs 3 and 4.Attachment 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!