Plant 44 Audit Reports - Wright-Patterson Air Force Base
Plant 44 Audit Reports - Wright-Patterson Air Force Base
Plant 44 Audit Reports - Wright-Patterson Air Force Base
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
FOR OFFICIAL USE ONLYDistribution authorized to DoD components and their contractors only; administrative/operational use;March 16, 2006. Other requests for this document shall be referred to the Chief, AcquisitionEnvironmental Safety & Health Division, Engineering Directorate, ASCIENV, <strong>Wright</strong> <strong>Patterson</strong> <strong>Air</strong> <strong>Force</strong><strong>Base</strong>, OH 454333.1.7. Bldg 849 (and other buildings). LPS air terminals (strike terminals) did not allhave two paths to ground. See NFPA 780, para 4.6.1.3. Such connections shallprovide a minimum of two paths to ground.3.1.8. bldg 864. LPS does not have access to ground rods for tested, some areas notbonded to eliminate side flashing, conductors painted, air terminals missing, etc3.1.9. Bldg 855. LPS ground rod test-wells not provided.3.1.10. Bldg 855. LPS air terminals over 24" in height are not all supported. See NFPA780, para 4.6.3.2.".f.L:i.2 .\h It"lrllil1,d' (-,:\/f'rll'".11 ;\ PUiiH Ilnlll'!