12.07.2015 Views

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SYNCHROPHASORS - INITIATIVE IN INDIA JUNE 20125.5.2 Case Study-28: Validation of offl<strong>in</strong>e simulation study with PMU dataA 3 phase fault had occurred <strong>in</strong> 400kV Bus-2 at Dadri TPS on 13 th March 2012 at 17:37:39hrs.The event was simulated <strong>in</strong> the PSS/E software and the fault current, bus voltage and shortcircuit MVA at the faulted bus was computed and compared with the data obta<strong>in</strong>ed from thesynchrophasors data dur<strong>in</strong>g the above event.Figure 85: Current flow <strong>in</strong> 400kV Agra-Gwalior l<strong>in</strong>e -1Figure 85 shows the current flow <strong>in</strong> 400kV Agra-Gwalior l<strong>in</strong>e -1. The current went up to 920Amperes dur<strong>in</strong>g the occurrence of fault at Dadri TPS.Figure 86: current flow <strong>in</strong> 400kV Agra-Gwalior l<strong>in</strong>e -2Figure 86 shows the current flow <strong>in</strong> 400kV Agra-Gwalior l<strong>in</strong>e -2. The current went upto 927Amperes dur<strong>in</strong>g the occurrence of fault at Dadri TPS.POSOCO Page 93 of 143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!