12.07.2015 Views

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SYNCHROPHASORS - INITIATIVE IN INDIA JUNE 2012In the Southern Regional power system, analysis of several grid disturbances [Reference 1] thatoccurred <strong>in</strong> 2002 revealed that that the disturbance had occurred whenever the angularseparation between 400 kV Ramagundam (generation complex) and 400 kV Neyveli (loadcentre) generally exceeded 60 degrees (Refer figure: 1).Likewise <strong>in</strong> the Northern Region, the experience of several <strong>in</strong>cidents of separation of theEastern (pit head generation pocket) and Western part (load centre) of the Northern Regionrevealed that the angular separation between 400 kV Rihand (<strong>in</strong> South eastern part) and 400 kVDadri (<strong>in</strong> the Western part) and the power flow across the East-West transmission corridor wasrequired to be ma<strong>in</strong>ta<strong>in</strong>ed with<strong>in</strong> 40 degrees and 3500 MW respectively (Refer figure 2).Figure 2: Angular separation between Rihand and Dadri on 26-July-2004The above two experiences established that the angular separation between different nodes <strong>in</strong>the grid is an <strong>in</strong>dicator of the stress <strong>in</strong> the grid and the need for monitor<strong>in</strong>g it <strong>in</strong> real-time wasfelt. However, s<strong>in</strong>ce the direct measurement of phase angles was not available through SCADA,the angular separation across the HVDC Rihand-Dadri bipole was computed externally andmade available to the operator (refer figure 3).Thereafter, an experiment with telemetry of measured phase angle separation between theadjacent 400 kV buses of an HVDC V<strong>in</strong>dhyachal back to back station with<strong>in</strong> the synchronoussystem was carried out <strong>in</strong> 2007. Initially a voltage transducer was placed at HVDC V<strong>in</strong>dhyachalback-to-back station and the 400 kV R-phase voltage of the V<strong>in</strong>dhyachal North bus andV<strong>in</strong>dhyachal West bus was given as <strong>in</strong>put. The vector difference of the two voltages wastelemetered (through exist<strong>in</strong>g SCADA) at the Northern Regional Load Despatch Centre and thePOSOCO Page 16 of 143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!