12.07.2015 Views

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SYNCHROPHASORS - INITIATIVE IN INDIA JUNE 2012Figure 70 shows that 1 second after occurrence of fault <strong>in</strong> Y-phase i.e., at 03:59:45.240 hrs,there is a rise <strong>in</strong> Y-Phase voltage whereas no rise <strong>in</strong> voltage <strong>in</strong> R & B phases. This rise <strong>in</strong> Y-phase voltage <strong>in</strong>dicates clos<strong>in</strong>g of Y-pole which <strong>in</strong>-turn confirms auto-reclose of l<strong>in</strong>e. The timeobserved from PMU matches with the SCADA SOE time.Figure 71: Voltage profile at Dadri show<strong>in</strong>g unsuccessful auto-reclosureFigure 71 shows the case of an unsuccessful auto-reclosure. Plot shows the 400kV Bus voltageof Dadri bus dur<strong>in</strong>g fault <strong>in</strong> 400kV Dadri-Greater Noida l<strong>in</strong>e (current and voltage of this l<strong>in</strong>e is notwired to Dadri PMU). It can be observed that the 1 st fault occurred <strong>in</strong> R-phase which got cleared<strong>in</strong> 80milli seconds (approx) and 1 second after occurrence of fault there is 2 nd dip <strong>in</strong> R-phasevoltage which <strong>in</strong>dicates that the R-pole of breaker tried to reclose but still fault was persist<strong>in</strong>g.POSOCO Page 82 of 143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!