SYNCHROPHASORS - INITIATIVE IN INDIA JUNE 2012Figure 93: Oscillations <strong>in</strong> Hisar Bawana flowFigure 91, 92, 93 shows the PMU plots for frequency, 400kV Hisar bus voltage and 400kVHisar-Bawana power flow. One of four outgo<strong>in</strong>g l<strong>in</strong>es from Jhakri complex had tripped on 16 thJuly 2011 at 4:28 hrs and the SPS operation got delayed by around 10 seconds. Oscillationswere observed for around 10 seconds when the flow on the rema<strong>in</strong><strong>in</strong>g three evacuat<strong>in</strong>g l<strong>in</strong>eswas around 800MW. Upon operation of SPS after 10 seconds i.e., tripp<strong>in</strong>g of units at KarchamHydro station (frequency dip) the oscillations died down. Hence PMU data validated the transfercapability and <strong>in</strong>stallation of SPS for reliable evacuation of power from the Jhakri-Baspa-Karcham generation complex.POSOCO Page 98 of 143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!