12.07.2015 Views

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SYNCHROPHASORS - INITIATIVE IN INDIA JUNE 2012Figure 30: Open PDC data flowPMU InstallationAs a prerequisite for PMU logistics, substations were requested to make necessaryarrangements for power supply (220 VAC or 24 VDC) and to extend connections from meter<strong>in</strong>gcore of PT and CT.Installation of PMU at BhadrawatiAt Bhadrawati the PMU was <strong>in</strong>stalled <strong>in</strong> 400 kV Raipur Feeder-I which is housed <strong>in</strong> the 400 kVAC Control Room along with dedicated GPS module. However, exist<strong>in</strong>g MUX for rout<strong>in</strong>g data toWRLDC was housed <strong>in</strong> 400 kV HVDC Control Room which is around 1.5 kms away from the ACControl Room. Ethernet cable normally used for data communication will not be able to carrydata over the distance <strong>in</strong> this case. The situation was resolved us<strong>in</strong>g media converters and anexist<strong>in</strong>g spare FO cable already laid between the AC and HVDC Control Rooms. Installationand <strong>in</strong>tegration of Bhadrawati PMU was completed on 14 th March 2012.Installation of PMU at RaipurPOSOCO Page 45 of 143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!