SYNCHROPHASORS - INITIATIVE IN INDIA JUNE 20124.2.4 Case Study-5: Loss of generation at Rihand STPSRihand STPS has an <strong>in</strong>stalled capacity of 2000 MW (4 x 500 MW). Dur<strong>in</strong>g the loss the completepower station a decrease of 10 degrees <strong>in</strong> the angular separation between V<strong>in</strong>dhyachal andMoga can be seen <strong>in</strong> Figure 47.Figure 47: Angular separation dur<strong>in</strong>g generation loss at RihandPOSOCO Page 60 of 143