12.07.2015 Views

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SYNCHROPHASORS - INITIATIVE IN INDIA JUNE 20125.4.6 Case Study-25: Validation of the operation time of SPSA System Protection Scheme (SPS) has been <strong>in</strong>stalled at NapthaJhakri Hydro station to trip oneor more generat<strong>in</strong>g units at Karcham Wangtoo <strong>in</strong> case of tripp<strong>in</strong>g of one or more evacuationfeeders from the complex. The SPS operated on 16 th July 2011 due to tripp<strong>in</strong>g of 400kV Jhakri-Abdullapur l<strong>in</strong>e-1. The runn<strong>in</strong>g units at Karcham Wangtoo HEP tripped. The synchrophasorsdata captured dur<strong>in</strong>g the event along with SCADA sequence of events and Disturbance record/Event logger from 400kV Abdullapur (P.G) substation & Karcham Wangtoo HEP were used tocompare the actual SPS operation time with the envisaged operation time.Table 9: Tripp<strong>in</strong>g time details of Jhakri-Abdullapur l<strong>in</strong>eAbdullapur (P.G)SCADAAs <strong>in</strong>ferredDisturbancesequence offrom PMU dataEventrecordEvents (SOE)at NRLDCTime of receipt of Direct trip atAbdullapurTime of open<strong>in</strong>g of 400kVAbdullapur-Jhakri Ma<strong>in</strong> breakerTime of open<strong>in</strong>g of 400kVAbdullapur-Jhakri Tie breaker04:28:57.330 04:28:57.30204:28:57.370 04:28:57.32604:28:57.371 04:28:57.3424:28:57.240Table No. 9 shows the 400kV Jhakri-Abdullapur l<strong>in</strong>e-2 tripp<strong>in</strong>g time obta<strong>in</strong>ed from Abdullapurend disturbace recorder, SCADA SOE & PMU data. It can be observed that circuit breakers of400kV Jhakri-Abdullapur l<strong>in</strong>e-2 tripped at 4:28:57.371 hrs which matches with the SCADA SOEand PMU data.Table 10: Tripp<strong>in</strong>g time details of Karcham Wangtoo stationEvent Karcham E.L NRLDC SOE NRLDC PMUTime of receipt of SPS signal atKarcham04:29:07.217 --- ---Tripp<strong>in</strong>g of unit -2 at Karcham 04:29:07.898 --- 04:29:07.800Tripp<strong>in</strong>g of unit -1 at Karcham 04:29:07.990 --- 04:29:07.800Table No.10 shows the tripp<strong>in</strong>g time of runn<strong>in</strong>g units at Karcham Wangtoo HEP. It can beobserved that the units tripped at 4:29:07.800 hrs which closely matches with PMU data.POSOCO Page 89 of 143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!