12.07.2015 Views

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SYNCHROPHASORS - INITIATIVE IN INDIA JUNE 2012After completion of the first two phases of the project total eight PMUs and one PDC has been<strong>in</strong>stalled and are functional. In the Western Region two PMUs and one PDC has been <strong>in</strong>stalledwhile <strong>in</strong> the Southern Region three PMUs and one PDC has been <strong>in</strong>stalled as a demo. The pilotproject <strong>in</strong> NR was approved by the Central Electricity Regulatory and funded from the surplusfund available <strong>in</strong> the Unscheduled Interchange pool account while the <strong>in</strong>stallations <strong>in</strong> Westernand Southern Region are demonstration projects. The other details of the project taken up <strong>in</strong> thethree regions have been summarized <strong>in</strong> Table 2.2.2 Location of Phasor Measurement UnitsThe primary objective of the pilot/demo projects was to comprehend the synchrophasortechnology and its applications for Power System Operation. Further it was also understood thatthe PMU commissioned at a substation could be relocated very quickly <strong>in</strong> case the earlierselection of location was not found appropriate. Therefore a heuristic approach was adopted forfaster implementation. The broad procedure for selection of PMU locations is described below:i. Locations separated by large geographical distanceii. Locations with large phase angle separation estimated from steady state load flowstudies for different anticipated scenarioiii. Locations near large generation complexiv. Locations hav<strong>in</strong>g broadband communication l<strong>in</strong>k with NRLDC (location of the PDC)v. Locations perceived to be critical based on operator experienceIn the phase-I of the pilot project taken up <strong>in</strong> Northern Region, the PMUs were placed at fourlocations viz. 400 kV side of V<strong>in</strong>dhyachal HVDC back to back station; 400 kV Dadri; 400 kVKanpur and 400 kV Moga substations. The PDC was placed at the Northern Regional LoadDespatch Centre (NRLDC). In the phase-II the PMUs were placed at 400 kV Hisar, 400 kVBassi, 400 kV Agra and 400 kV Kishenpur. Later an additional PMU was <strong>in</strong>stalled at the 400 kVKarcham Wangtoo HEP by Jaiprakash Power Ventures Ltd.In the Western Region, the PMUs are located <strong>in</strong> 400 kV Bhadravati and 400 kV Raipursubstations.In the Southern Region the three PMUs are located <strong>in</strong> 400 kV Salem, 400 kV Bengaluru and400 kV Hyderabad.The geographical position may be referred <strong>in</strong> figure 7, 8 9, and the general architecture of the<strong>in</strong>stallation is shown as figure 10.POSOCO Page 22 of 143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!