12.07.2015 Views

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SYNCHROPHASORS - INITIATIVE IN INDIA JUNE 20125 CHAPTER 5: UTILIZATION OF SYNCHROPHASOR IN OFF LINEThe synchrophasors data from the PMUs archived <strong>in</strong> the historian has been utilized extensively<strong>in</strong> analysis of grid events and validation of protection system. These applications have beenillustrated with the help of case studies <strong>in</strong> the sections ahead.5.1 Identifications of the type, nature and duration of faultA fault <strong>in</strong> A.C system gets reflected <strong>in</strong> the entire synchronized grid. Hence it is possible toanalyze the fault at a particular location by analyz<strong>in</strong>g PMU data of any other substationconnected <strong>in</strong> the grid. Us<strong>in</strong>g voltage and current 40 ms data plots, it is possible to f<strong>in</strong>d out thetype of fault, fault duration, successful/ un-successful auto-reclosure and operation/ misoperationof protection system.Faults <strong>in</strong> transmission l<strong>in</strong>e could be balanced (Three phase l<strong>in</strong>e to l<strong>in</strong>e or l<strong>in</strong>e to ground) orunbalanced (L<strong>in</strong>e to l<strong>in</strong>e or l<strong>in</strong>e to ground). Dur<strong>in</strong>g the fault, the voltage <strong>in</strong> the faulted phase dipssharply while the current rises sharply. The voltage/current normalize after the fault is cleared byoperation of the protective switchgear. Thus, the exam<strong>in</strong>ation of the 3-phase voltage/currenttrends available from synchrophasors would reveal the time of the fault, the type/nature of faultthat has occurred and the duration <strong>in</strong> which it was cleared.5.1.1 Case Study-6: Three phase fault at 400kV Dadri on 13-Mar-2012The figure below shows the 400kV Agra bus voltage profile (Phase to Earth) dur<strong>in</strong>g the threephase fault at 400 kV Dadri at 17:37:920 hrs on 13 th March 2012. It can be observed that thereis a sharp dip <strong>in</strong> voltage <strong>in</strong> all the three phases.POSOCO Page 61 of 143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!