SYNCHROPHASORS - INITIATIVE IN INDIA JUNE 20125.2.2 Case Study-15: Three phase fault at 400 kV Farakka on 16-Mar-2012Similarly figure 58 shows the dip <strong>in</strong> voltage of all the three phases at 400kV V<strong>in</strong>dhyachal(Northern Region) can be seen dur<strong>in</strong>g a 3 phase fault at Farakka STPS (<strong>in</strong> Eastern region). Itcan be seen that there was delayed fault clearance i.e. <strong>in</strong> 1280 milli seconds.Figure 58: Voltage profile at V<strong>in</strong>dhyachal (NR) dur<strong>in</strong>g tripp<strong>in</strong>g of units at Farakka STPS (ER)POSOCO Page 72 of 143