Synchrophasor Initiative in India - erldc
Synchrophasor Initiative in India - erldc
Synchrophasor Initiative in India - erldc
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SYNCHROPHASORS - INITIATIVE IN INDIA JUNE 20125.4 Validation of protection system with synchrophasor dataAnalysis of the operation of the protection system has been illustrated <strong>in</strong> the earlier sections.The section ahead illustrates few case studies of audit of the df/dt relays, Disturbance Recorderand System Protection Schemes.5.4.1 Case Study-20: Validation of Auto-reclose of EHV l<strong>in</strong>eS<strong>in</strong>gle phase auto reclosure has been provided <strong>in</strong> 400 kV l<strong>in</strong>es for transient faults. The loperation of s<strong>in</strong>gle phase autoreclosure gets recorded <strong>in</strong> the Disturbance Recoder and Eventlog <strong>in</strong> the transmission substations. At the Regional/State Load Despatch Centre the Autoreclosure operation is recorded <strong>in</strong> the Sequence of Events available through the SCADAsystem. The synchrophasors data available at every 40 ms has enabled visualization andvalidation of the auto reclosure operation <strong>in</strong> the Load Despatch Centre. In Northern RegionPMU has been <strong>in</strong>stalled at 400 kV Bassi substation also. The voltage <strong>in</strong>put to this PMU is from400 kV bus CVT and the current <strong>in</strong>put is from 400 kV Agra-Bassi I and 400 kV Agra-Bassi IIl<strong>in</strong>es. The event of auto-reclosure of 400 kV Bassi-Heerapura I on 2 nd January 2012 could be<strong>in</strong>ferred with the help of data received from Bassi PMU and confirmed with the help of SCADASequence of Events (SOE) records at NRLDC.Sequence of events <strong>in</strong> SCADA shows the open<strong>in</strong>g and clos<strong>in</strong>g time of 400kV Heerapura-Bassickt-1 breaker is shown. It is observed that the breaker closes after 1 second which <strong>in</strong>dicates itsclosure after dead time. The event as visulaized with the help of the voltage phasor dataavailable from the PMU <strong>in</strong>stalled at 400kV Bassi substation is displayed as figure 69.POSOCO Page 80 of 143