12.07.2015 Views

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SYNCHROPHASORS - INITIATIVE IN INDIA JUNE 20126.3 Suggestions for improved visualization• Contour display of voltage, angle and frequency for easy comprehension by theoperator. It would also facilitate easy detection of off nom<strong>in</strong>al voltage and location ofislands.• Playback facility to view data for past few hours6.4 Utilization of <strong>Synchrophasor</strong>s <strong>in</strong> offl<strong>in</strong>e• Visualization of power system dynamics with the help of State measurements.• Visualization of phasors, sequence components, angular separation, <strong>in</strong>ter areaoscillations, df/dt, voltage dip dur<strong>in</strong>g fault, voltage recovery after clearance of fault,synchrocheck etc.• Extensive utlization for post event (forensic) analysis. It helped <strong>in</strong> detection of type offault (phases <strong>in</strong>volved), Identification of the phase <strong>in</strong> which fault has occurred, Faultclear<strong>in</strong>g time Protection misoperation detection• Detection of various modes <strong>in</strong> low frequency oscillation us<strong>in</strong>g techniques like PronyAnalysis, Fast Fourier Transform etc.• Detection of <strong>in</strong>ter area/local mode oscillations• Validation of operation of under frequency and df/dt relays due to availability of highresolution frequency data at the control centre.• Used <strong>in</strong> computation of Frequency Response Characteristic• Delay of 8 cycles was <strong>in</strong>troduced <strong>in</strong> the df/dt relays <strong>in</strong> Northern Region to reducemisoperations.• Identification of coherent group of generators dur<strong>in</strong>g grid event• Observ<strong>in</strong>g SVC response dur<strong>in</strong>g grid events• Validation of operation time of SPS used for <strong>in</strong>ter tripp<strong>in</strong>g generat<strong>in</strong>g units atKarchan Wangtoo after tripp<strong>in</strong>g of evacuation l<strong>in</strong>es• Validation of Transfer Capability for evacuation of Karcham Wangtoo generation;Oscillations were visible when the actual powerflow crossed the prescribed limits• Validation of Steady state network model <strong>in</strong> SCADA/EMS• Validation of fault level as reported by Disturbance Recorder and as computed fromoffl<strong>in</strong>e studiesOffl<strong>in</strong>e application of <strong>Synchrophasor</strong>s <strong>in</strong> <strong>India</strong> is tabulated below.POSOCO Page 129 of 143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!