SYNCHROPHASORS - INITIATIVE IN INDIA JUNE 20127 CHAPTER-7: CHALLENGESThe experience with synchrophasors has been a roller coaster ride full of exhilaration andexcitement. Though the synchrophasors data is presently available only from a few locations <strong>in</strong>the <strong>India</strong>n grid, yet it has dramatically raised visualization and the level of understand<strong>in</strong>g of thepower system with<strong>in</strong> the control centre with<strong>in</strong> few months of its commission<strong>in</strong>g. It has nowbecome an <strong>in</strong>dispensable part of the data resource available at the load dispatch centre. Thetwo years of experience has revealed several challenges [Reference 2, 4, 5 and 6] that need tobe addressed dur<strong>in</strong>g the full fledged project. These challenges and difficulties have beendiscussed below:7.1. Challenges with respect to visualization tools <strong>in</strong> real-timeHuge volume of synchrophasor data is be<strong>in</strong>g received and stored at the control center. It isdifficult to comprehend the data due to limited availability of real time &offl<strong>in</strong>e applications.However analysis is be<strong>in</strong>g done with limited number of available resources. With more numberof syncrophasors be<strong>in</strong>g <strong>in</strong>stalled, new type of displays need to be developed which are moreuser friendly so that they help <strong>in</strong> better visualization of the system. These would present abetter picture of the dynamic situation of the grid to the operator.7.2. Reliability of synchrophasor dataData loss occurs due to communication problem between PMU and control center. There iscomplete loss of data from one or more location or sometimes <strong>in</strong>termittent data loss for shorterperiod.Figure 131: Data loss of Kanpur PMU on 1st April 2011Figure 131 shows the data loss of Kanpur PMU on 1 st April 2011.POSOCO Page 133 of 143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!