12.07.2015 Views

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

Synchrophasor Initiative in India - erldc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SYNCHROPHASORS - INITIATIVE IN INDIA JUNE 20124.2 Visualization of angular separation between two nodes <strong>in</strong> the gridThe angular separation between two nodes with<strong>in</strong> a synchronous system is primarily a functionof the voltage at the two nodes; Impedance between the two nodes and the power flow betweenthe nodes. Therefore the angular separation between the two nodes is sensitive to the variation<strong>in</strong> one or more of these variables. This has been illustrated with the help of plot show<strong>in</strong>gvariation <strong>in</strong> angular separation between V<strong>in</strong>dhyachal/Kanpur/Dadri/Agra/Hisar/Bassi/Mogadur<strong>in</strong>g the follow<strong>in</strong>g four grid <strong>in</strong>cidents:• Complete 400/220 kV Allahabad substation handl<strong>in</strong>g 1900 MW;• Tripp<strong>in</strong>g of + 500 kV Rihand-Dadri HVDC bipole carry<strong>in</strong>g 1400 MW• Tripp<strong>in</strong>g of 400/220 kV ICTs at Greater Noida carry<strong>in</strong>g 430 MW• Tripp<strong>in</strong>g of complete power station at Rihand STPS generat<strong>in</strong>g 2000 MW4.2.1 Case Study-2: Complete outage of 400/220kV AllahabadOn 14th January 2012, a bus fault on 400 kV bus at Allahabad resulted <strong>in</strong>to loss of all the<strong>in</strong>com<strong>in</strong>g and outgo<strong>in</strong>g l<strong>in</strong>es at the 400/220 kV Allahabad substation handl<strong>in</strong>g 1900 MW. Thispower was diverted through other parallel circuits. The consequent change <strong>in</strong> the impedanceand the voltage caused a change of 34 degrees <strong>in</strong> the angular separation between V<strong>in</strong>dhyachaland Kanpur which are located on either side of the 400/220 kV Allahabad.Figure 44: Angular difference between buses <strong>in</strong> NR dur<strong>in</strong>g blackout at 400 kV AllahabadPOSOCO Page 57 of 143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!