<strong>Tender</strong> <strong>No</strong>.: <strong>465S</strong>/<strong>2011</strong>/<strong>12</strong><br />

3.10.3.14 After the inspection <strong>of</strong> the spray paint is finished, the installation <strong>of</strong> rope lights and fairy<br />

lights can be commenced.<br />

3.10.3.15 The old rope lights and fairy lights need to be tested and inspected to see if it can be reused.<br />

If rope lights or fairy lights are damaged, they need to be replaced with new ones.<br />

3.10.3.16 Rope lights and fairy lights must be installed on the frames according to design.<br />

3.10.3.17 Make sure that end caps are placed on the ends <strong>of</strong> the rope lights. These end caps need to<br />

be glued using PVC glue.<br />

3.10.3.18 Where rope lights are jointed, splice connectors must be made use <strong>of</strong>. These joints need to<br />

be covered with a heat shrink tube.<br />

3.10.3.19 Power leads and leads <strong>of</strong> the controller must be installed and insulated.<br />

3.10.3.20 Wires must be connected to each other using transparent wire connectors.<br />

3.10.3.21 Circuitry <strong>of</strong> the rope lights and fairy lights must be done according to the design.<br />

3.10.3.22 Where light needs darkening out, black heat shrinks and insulation tape must be used.<br />

3.10.3.23 All rope lights, fairy lights and wiring will be fixed to the set-piece frames by means <strong>of</strong> cable<br />

ties. <strong>No</strong> loose hanging wires will be allowed.<br />

3.10.3.24 The controller/flasher unit and dinky connectors for connecting the electrical power supply<br />

cable to the set-pieces will be placed in an outdoor utility box, which will be placed on the<br />

one bottom corner <strong>of</strong> the set-pieces.<br />

3.10.3.25 Once the rope lights and fairy lights have been fitted and is ready for installation, the setpieces<br />

must be tested. The <strong>City</strong> <strong>of</strong> <strong>Cape</strong> <strong>Town</strong> Electricity Services must be present while<br />

testing the set-pieces.<br />

3.10.3.26 Any defects or concerns raised by the <strong>City</strong> <strong>of</strong> <strong>Cape</strong> <strong>Town</strong> Electricity Services must be<br />

rectified before those set-pieces may be installed.<br />

3.10.4 SET-PIECE INSTALLATION SPECIFICATION (Catenary Mounted)<br />

3.10.4.1 For crossings 1 and 3 in Adderley Str the design changes every year. For the other<br />

crossings, the old set-pieces are used, but placed in other locations as the previous year.<br />

3.10.4.2 Make sure that the site is safe before commencement <strong>of</strong> installation works.<br />

3.10.4.3 Place out cones and the relative signage.<br />

3.10.4.4 Set-pieces must be installed at the catenary crossings over the road.<br />

3.10.4.5 Set-pieces must be placed directly next to each other.<br />

3.10.4.6 In the case where a sequence or a specific set <strong>of</strong> set-pieces need to be installed, that<br />

installation order must be followed according to the designer’s specification.<br />

3.10.4.7 Remove the nuts from the set-piece brackets (line tap).<br />

3.10.4.8 Set-pieces must be placed so that the catenary wire goes in the bracket (line tap).<br />

3.10.4.9 Ensure that the catenary wire is placed in all nine (9) <strong>of</strong> the brackets (line taps).<br />

3.10.4.10 Set-pieces must be installed so that the 2.1m side <strong>of</strong> the set-piece are in a vertical position.<br />

3.10.4.11 Replace the nuts <strong>of</strong> the brackets, ensuring that the catenary wire is in tacked inside the<br />

bracket.<br />

3.10.4.<strong>12</strong> All wiring <strong>of</strong> set-pieces must be finished and it must be ensured that the <strong>City</strong> <strong>of</strong> <strong>Cape</strong> <strong>Town</strong><br />

Electricity Services can do the termination <strong>of</strong> the set-piece at the dinky connectors, to the<br />

existing electrical supply network.<br />

46