<strong>Tender</strong> <strong>No</strong>.: <strong>465S</strong>/<strong>2011</strong>/<strong>12</strong><br />
1. <strong>Tender</strong>ers must include a table <strong>of</strong> foreign currency content per item attached hereto.<br />
2. <strong>Tender</strong>ers are required to give a breakdown <strong>of</strong> each item’s exchange rate variation in the table referred to) above.<br />
3. The actual rates and the dates on which these items are based must be quoted. Merely to state ‘ruling rates’ at a<br />
particular date is not acceptable. If more than one tendered item is affected, the relevant information shall be stated in<br />
the table attached hereto.<br />
4. Where prices are subject to a rate <strong>of</strong> exchange, suppliers must indicate on their exchange the rate <strong>of</strong> applicable,<br />
as well as the date and method <strong>of</strong> the foreign payment (for example, against L/C on date <strong>of</strong> shipment, or upon<br />
receipt, etc.).<br />
5. The CCT will require a supplier to purchase Forward Cover for each individual order at the time <strong>of</strong> placing the order<br />
during the contract period, and to supply the CCT with a copy <strong>of</strong> the foreign contract and such other documentation<br />
as the CCT may deem necessary.<br />
6. If Forward Cover has not been obtained yet, it is a condition <strong>of</strong> this contract that at the time when the final<br />
confirmation <strong>of</strong> the award is communicated to the supplier (successful tenderer), the supplier must immediately<br />
make appropriate arrangements to take out Forward Cover to avoid further fluctuations in the Rand value <strong>of</strong> the<br />
contract.<br />
7. In the event <strong>of</strong> vi) above, the supplier must ensure that the Director : Supply Chain Management is furnished with<br />
a full set <strong>of</strong> supporting documents (e.g. Bill <strong>of</strong> Entry, Pro<strong>of</strong> <strong>of</strong> Purchase <strong>of</strong> Foreign Exchange from Bank, and<br />
Foreign Invoice) before payment for the imported goods can be claimed.<br />
8. This condition may be varied by a written instruction attached to the Form <strong>of</strong> Offer and Acceptance, which will be<br />
signed on confirmation <strong>of</strong> the contract award to the successful tenderer.<br />