<strong>Tender</strong> <strong>No</strong>.: <strong>465S</strong>/<strong>2011</strong>/<strong>12</strong><br />

3.11 POLE TO POLE BELT LIGHTS (Streamers)<br />

3.11.1 SITE LOCATIONS FOR POLE TO POLE BELT LIGHTS (Streamers)<br />

3.11.1.1 Southern Region<br />

� Gugulethu 1<br />

� Parkwood<br />

3.11.1.2 <strong>No</strong>rthern Region<br />

� Koeberg<br />

� Woodstock<br />

3.11.1.3 Eastern Region<br />

� Somerset West<br />

3.11.2 POLE TO POLE BELT LIGHTS (Streamers) SPECIFICATION<br />

3.11.2.1 The light bulbs for the Belt Lights (Streamers) must be as follow:<br />

� For static lights - 240V 7W fused Energy saving golf ball type<br />

� For flashing lights - 240V 15W fused Golf ball type<br />

3.11.2.2 The Belt Lights (Streamers) must be 2.5mm² 2 core cable. Cable cores must be insulated<br />

red and black. Outside cable insulation must be black. The lamp holders in on the cables<br />

must be black polyurethane bayonetted type, 230V 2A. The top and bottom <strong>of</strong> lamp holder<br />

must be fixed together with silver plated screws and nuts. The top part must connect to the<br />

cable with double brass spikes. The lamp holders to be IP65 rated.<br />

3.11.3 POLE TO POLE BELT LIGHTS (Streamers) INSTALLATION SPECIFICATION<br />

3.11.3.1 Belt Lights (Streamers) must be installed on a catenary wire which must be mounted from<br />

one streetlight pole to another.<br />

3.11.3.2 Belt Lights (Streamers) must be fixed to the 4mm catenary wire by means <strong>of</strong> cable ties.<br />

3.11.3.3 All wiring <strong>of</strong> pole Belt Lights must be finished and it must be ensured that the <strong>City</strong> <strong>of</strong> <strong>Cape</strong><br />

<strong>Town</strong> Electricity Services can do the termination <strong>of</strong> the Belt Lights (Streamers) at the dinky<br />

connectors, to the existing electrical supply network.<br />

3.11.3.4 Ensure that there are no loose hanging wires. All wires need to be made neat by means <strong>of</strong><br />

cable ties.<br />

3.11.3.5 After installation, the <strong>City</strong> <strong>of</strong> <strong>Cape</strong> <strong>Town</strong> Electricity Services must be informed and an<br />

inspection must be done.<br />

3.11.3.6 In the case where the installation is not as required, or if there is any defects with respect to<br />

the installation, design or sequence <strong>of</strong> the pole Belt Lights, the Contractor need to fix that<br />

defect with no additional cost or claim.<br />

50